Loading…
Loading…
Tender Value
₹39.3 L
EMD Value
₹78,552
Closing Date
29 Jun 2026, 2:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Xen Jal Shakti Hydraulic Division Kishtwar
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to BOQ
2026_PHE_313141_9
e-NIT 29 of 2026-27 Dated 20-06-2026
Open Tender
Civil Works
60 days
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
Xen Jal Shakti Hydraulic Division Kishtwar
₹78,552
Xen Jal Shakti Hydraulic Division Kishtwar
20 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of HDPE Pipes from nearest store to road side of work for an average distance of 420 km by Mechanical Transport | - | MT | 1 | - |
| 2 | Carriage of HDPE pipes from road side to site of work for an avg. distance 1.50 km by Head Load | - | MT | 1 | - |
| 3 | Carriage of G.I Pipes from nearest store to road side of work for an average distance of 420 km by Mechanical Transport | 1 | MT | 1 | ₹1 |
| 4 | Carriage of G.I pipes from road side to site of work for an avg. distance 0.50 km by Head Load | - | MT | 1 | - |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | - | Cum | - | - |
| 6 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Ordinary Rock | - | Cum | 1 | - |
| 7 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | 1 | - |
| 8 | Providing and fixing HDPE Pipes complete with G.I. fittings excluding trenching and refilling etc. HDEP PIPE 75 mm | - | m | - | - |
| 9 | HDEP PIPE 63 mm | - | m | 1 | - |
| 10 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 65 mm dia. nominal bore | - | m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1013452.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid