| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.5 LAccepted-AOC | ₹48.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹48.6 LRejected-AOC | ₹48.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | T.THIRUPATHI L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Strenthening of the Road From Pethamelupalli to RTO Office (Jodukundupallam) Km 0/850-1/700 H/o Kallukurukki Rs. 49.00 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 816 | Sqm | 6.36 ₹5,189.76 | 6.37 ₹5,197.92 |
| 3.00 | Picking 5 cm to 10 Cm Old Metalled surface and sectioning 1Sqm | 1,062.5 | Sqm | 23.34 ₹24,798.75 | 23.38 ₹24,841.25 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content | 114.75 | Cum | 340.84 ₹39,111.39 | 341.44 ₹39,180.24 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 478.13 | Cum | 2,492.69 ₹11.9 L | 2,497.08 ₹11.9 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,187.5 | Sqm | 88.89 ₹2.8 L | 89.05 ₹2.8 L |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,187.5 | Sqm | 20.91 ₹66,650.63 | 20.95 ₹66,778.13 |
| 8.00 | Bituminous Macadam (Grade-II) 50mm Thick Using VG30
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 159.38 | Cum | 8,968.62 ₹14.3 L | 8,984.42 ₹14.3 L |
| 9.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II)
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 79.69 | Cum | 11,499.4 ₹9.2 L | 11,519.66 ₹9.2 L |
| 10.00 | Provision for HM Stone | 3 | Nos | 574.21 ₹1,722.63 | 575.22 ₹1,725.66 |
Tender Value
₹49 L
EMD Value
₹49,000
Closing Date
17 Feb 2026, 3:00 pmClosed
The Block Development Officer Krishnagiri
The Block Development Office Krishnagiri
1. Krishnagiri DT Krishnagiri Block Under Mine and Minerals 2025-2026 Strengthening of the Road From Peddamelupalli to RTO Office Jodukundupallam at Kallakurikki Package No 2025-2026 KGI 37
2026_RDTN_656460_4
RocNo_71_2024_A4_09_01_2026
Open Tender
Civil Works - Roads
180 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹49,000
28 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
Strenthening of the Road From Pethamelupalli to RTO Office (Jodukundupallam) Km 0/850-1/700 H/o Kallukurukki Rs. 49.00 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 Cm Old Metalled surface and sectioning 1Sqm
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stone
Provision for KM Stone
Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete
Provision for Road marking with hot applied Themoplastic compound with Reflectorining glass beads in Bituminous surface
Provision for Sign board 60cm size including all charges etc complete
Provision for Citizen Board & Name Board
Provision for Photographics Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_787225.xls
BOQ • 0.40 MB
TBKGI37.pdf
Tender Documents • 0.50 MB
PBKGI37.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid