| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹23.0 L+₹64,979.32 (2.91%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Lakshmipathy L2 | Sri Valan Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Labour Charges for cutting road for laying sewer Mains and as Directed by the Engineer i/c (Qty as Per detailed Working Sheet and all other charges etc … complete as per Specifications i) BT Road | 0.6 | Cum | 1,000 ₹600 | 929 ₹557.4 Lowest |
| 2.00 | ii) cc Road | 38.25 | Cum | 1,400 ₹53,550 | 1,302 ₹49,801.5 Lowest |
| 3.00 | Hsc | 3.15 | Cum | 940 ₹2,961 | 929 ₹2,926.35 Lowest |
| 4.00 | Supply and Delivery of DWC Structured Wall Polyethylene Piping Systems (Pipe with online/offline coupler and elastomeric sealing ring) with required specials non-smooth external annular corrugated and smooth internal surface (Double wall) (SN 8 Class) for non-pressure underground sewerage, drainage application generally as per IS-16098 (Part-2) type B.Page No 49 150 mm DWC | 510 | Mtr | 300 ₹1,53,000 | 262 ₹1,33,620 Lowest |
| 5.01 | 0 mtr to 1.50 mtr Depth | 383 | Cum | 300 ₹1,14,900 | 292 ₹1,11,836 Lowest |
| 5.02 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. 150 mm DWC | 38.25 | Cum | 1,500 ₹57,375 | 1,497 ₹57,260.25 Lowest |
| 5.03 | Laying and Jointing of DWC SN 8 Class Pipes For Non Presuare Underground Sewarage and specials into the tranches and laying to proper grade and alignment including all other labour charges …etc complete WD-W0426 Page no 171 150 mm DWC | 510 | Rm | 56 ₹28,560 | 55 ₹28,050 Lowest |
| 6.00 | Construction Of Brick Work Manholes SulphateResistant Cemrnt At Various depths to Invert Including Earth Work Excavation as per SS20B , laying Cement Concrete in CM 1:3:6 using 40mm BG jelly for foundation,Sinking Well kerb below GL for 4.5 mtr Depth And Above Pumping timbering Charges for 2.5 mtr Depth and Above Stock Brick Work in CM 1:3, for 23cm thick wall ,plastering Interior with CM 1:3, 20 mm thick and exterior with CM 1:3, 12mm thick laying cement concrete CM 1:3:6 using 12 to 20 mm BG Jelly, Fixing The Frame , Providing CI Steps, ManHole Cover And Frame Benching And Chanelling including Reffiling with Exavated Earth And Disposal Of Surplus Earth etc, Complete for the Following Sizes of Man Holes 0 to 1.5 mtr Depth | 18 | Nos | 27,600 ₹4,96,800 Lowest | 27,600 ₹4,96,800 Lowest |
| 7.00 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical andhorizontal poles with coir rope including fixing charges and fixing 75mm diareflectors including earth work excavation for fixing vertical posts and finallyremoving and stacking the materials safely for further use etc., complete and as
directed by TWAD Board officers. WD-W0936 | 510 | RM | 60 ₹30,600 | 58 ₹29,580 Lowest |
| 8.00 | Refilling the trenches with excavated soil complying with standard specification in layers of 23 CM including watering consolidation for filling complete and as directed by engineering incharge | 341.7 | M3 | 45 ₹15,376.5 | 40 ₹13,668 Lowest |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
16 Sept 2025, 3:00 pmClosed
The Commissioner,TCMC
Muthurangan Street
providing Sewerage line Facilities at Ward 64 at Zone 5 East Tambaram Area in Tambaram City Municipal Corporation.
2025_DMA_604039_3
003/2025/E1/Z5
Open Tender
Civil Works
Works
Zone 5
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹27,000
10 Nov 2025
15 Sept 2025
16 Sept 2025
15 Sept 2025
16 Sept 2025
15 Sept 2025
Amount
Labour Charges for cutting road for laying sewer Mains and as Directed by the Engineer i/c (Qty as Per detailed Working Sheet and all other charges etc … complete as per Specifications i) BT Road
ii) cc Road
Supply and Delivery of DWC Structured Wall Polyethylene Piping Systems (Pipe with online/offline coupler and elastomeric sealing ring) with required specials non-smooth external annular corrugated and smooth internal surface (Double wall) (SN 8 Class) for non-pressure underground sewerage, drainage application generally as per IS-16098 (Part-2) type B.Page No 49 150 mm DWC
0 mtr to 1.50 mtr Depth
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. 150 mm DWC
Laying and Jointing of DWC SN 8 Class Pipes For Non Presuare Underground Sewarage and specials into the tranches and laying to proper grade and alignment including all other labour charges …etc complete WD-W0426 Page no 171 150 mm DWC
Construction Of Brick Work Manholes SulphateResistant Cemrnt At Various depths to Invert Including Earth Work Excavation as per SS20B , laying Cement Concrete in CM 1:3:6 using 40mm BG jelly for foundation,Sinking Well kerb below GL for 4.5 mtr Depth And Above Pumping timbering Charges for 2.5 mtr Depth and Above Stock Brick Work in CM 1:3, for 23cm thick wall ,plastering Interior with CM 1:3, 20 mm thick and exterior with CM 1:3, 12mm thick laying cement concrete CM 1:3:6 using 12 to 20 mm BG Jelly, Fixing The Frame , Providing CI Steps, ManHole Cover And Frame Benching And Chanelling including Reffiling with Exavated Earth And Disposal Of Surplus Earth etc, Complete for the Following Sizes of Man Holes 0 to 1.5 mtr Depth
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical andhorizontal poles with coir rope including fixing charges and fixing 75mm diareflectors including earth work excavation for fixing vertical posts and finallyremoving and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers. WD-W0936
Refilling the trenches with excavated soil complying with standard specification in layers of 23 CM including watering consolidation for filling complete and as directed by engineering incharge
Disposal of surplus Earth including loading unloading conveyance with in a lead of 5 km and consideration etc as directed by engineering incharge
110 mm dia PVC Pipeline
150 mm dia PVC Pipeline
Provision for De/watering arrangements Wherever necessary
Road Restoration with Cement concrete 1:4:8, 10cm thick using 40 mm HBS metal and Cement Concrete 1:2:4, 10cm thick using 20 mm HBS metal including cost of all material laying, curing, including earth work Excavation for a Depth of 40 cm and Sand filling Earthwork Excavation
M Sand Filling
plain CC 1:4:8 mix using 40 mm Metal
plain CC 1:2:4 mix using 20 mm Metal
Lakshmipathy (BID ID -1461164)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_722027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .