Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.9 L+₹7,009.97 (1.02%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Tempering on CDR | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-same CDR used in another work | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Old Challan used |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
3 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Culvert and Lane from GHS Thein to Mohd Aslam Mohalla, Pyt Thein, Block Keerian Gandyal
2026_RDPR_316973_11
e-NIT No.129/REW/K of 2026-27 Dated 20/07/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
keeriyan gandiyal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹14,000
14 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by Mechanical (Hydrulic excavator) over areas ( exceeding 30 m in depth,1.5 m in width as wel as 10sqm on plan), including disposal of Excavate earth upto 50.0m and 1.5m ,as directed by Engineer in Charge.(Soil Clasification 70% ordinary rock and 30% Hard rock) | 4.76 | cum | 392.3 | ₹1,867.35 |
| 2 | 30% Hard Rock | 7.14 | cum | 687.1 | ₹4,905.89 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement :5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . | 1.36 | cum | 4,826.5 | ₹6,564.04 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 34.89 | cum | 5,733.6 | ₹2,00,045.3 |
| 5 | Providing and supplying of 30% Boulders | 14.95 | cum | 937.9 | ₹14,021.61 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.23 | cum | 7,788.4 | ₹1,18,617.33 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 1,674.99 | kg | 123.2 | ₹2,06,358.77 |
| 8 | Centering and shuttering including strutting, propping etc. | 184.99 | sqm | 286.35 | ₹52,971.89 |
| 9 | Suspended Floor | 30.33 | sqm | 718.4 | ₹21,789.07 |
| 10 | Edges of Slab | 22.2 | Rmt | 262 | ₹5,816.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1036620.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .