Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.6 CrAccepted-Finance | ₹3.6 Cr | 1 | Accepted-Finance Accepted |
| 2 | 2₹4.5 CrAccepted-Finance | ₹4.5 Cr | 2 | Accepted-Finance Accepted |
| 3 | 3₹5.0 CrAccepted-Finance | ₹5.0 Cr | 3 | Accepted-Finance Accepted |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
15 Apr 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Demolishing and Re-construction of Ambedkar Choupal at Village Mubarakpur in Kirari A.C.
2026_IFC_289589_1
EE/CD-VIII/NIT/2026-27/03
Open Tender
Civil Works
365 days
DELHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹8.0 L
17 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | |||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | |||||
| 3Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size). | |||||
| 5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level | |||||
| 6Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level | |||||
| 7Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable /recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/ cum) | |||||
| 8Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | |||||
| 8.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more | - | Kilogram | - | - |
| 9Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete | |||||
stage.html
html • 0.04 MB
technical_384603.pdf
techsummary_384603.pdf
finance_384603.pdf
BOQ Comparative Chart
xlsx
finsummary_384603.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_384603.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid