| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹3.5 L+₹28,647.64 (8.91%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.6 L+₹42,404.79 (13.2%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹3.6 L+₹42,946.29 (13.4%)Rejected-Finance M NO 375 VIDYANAGAR HARTHALA SONAKPUR MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹3.7 L+₹43,679.90 (13.6%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S MALIK CONSTRUCTION L4 | M/S KUNWAR PAL CONTRACTOR L3 | SUKHAVINDER SINGH THEKEDAR L1 | V K CONTRACTOR L2 | M/S DEVENDRA PAL SINGH L8 | SAEED AHMED CONTRACTOR L7 | HINWAR CONSTRUCTION CO L6 | R.A.V. BUILDERS AND CONSULTANT L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling for making diversion in all type of soil i/c all lead & lift, dressing compaction etc. complete | 210 | M3 | 160 ₹33,600 | 190 ₹39,900 | 167.79 ₹35,235.9 | 150 ₹31,500 Lowest | 243 ₹51,030 | 216 ₹45,360 | 177.5 ₹37,275 | 153 ₹32,130 |
| 2.00 | Providing & Laying Ist class brick on edge soling 110 mm thick i/c cost of all material, labour, T&P etc complete | 54 | M2 | 372 ₹20,088 | 400 ₹21,600 | 461.65 ₹24,929.1 | 360 ₹19,440 Lowest | 471 ₹25,434 | 418 ₹22,572 | 380 ₹20,520 | 386 ₹20,844 |
| 3.00 | Dismantling brick masonry in lime or cement i/c stacking within 60m etc. complete | 23 | M3 | 429 ₹9,867 | 300 ₹6,900 | 282.28 ₹6,492.44 | 320 ₹7,360 | 407 ₹9,361 | 362 ₹8,326 | 250 ₹5,750 Lowest | 334 ₹7,682 |
| 4.00 | Dismantling R.B or R.C.C work i/c stacking within 60m etc. complete | 5.45 | M3 | 651 ₹3,547.95 | 500 ₹2,725 | 428.49 ₹2,335.27 | 488 ₹2,659.6 | 615 ₹3,351.75 | 548 ₹2,986.6 | 300 ₹1,635 Lowest | 507 ₹2,763.15 |
| 5.00 | Earth work in excavation of foundation i/c initial lead & lift etc. complete | 20 | M3 | 143 ₹2,860 | 100 ₹2,000 | 94.94 ₹1,898.8 Lowest | 107 ₹2,140 | 136 ₹2,720 | 125 ₹2,500 | 110 ₹2,200 | 111 ₹2,220 |
| 6.00 | Centering & shuttering for C.C. work i/c all cost of labour, material and T&P etc. complete | 19.2 | M2 | 294 ₹5,644.8 | 250 ₹4,800 | 193.45 ₹3,714.24 Lowest | 220 ₹4,224 | 278 ₹5,337.6 | 252 ₹4,838.4 | 294 ₹5,644.8 | 229 ₹4,396.8 |
| 7.00 | Providing & laying P.C.C 1:3:6 in foundation i/c all cost of labour, material, T&P etc. complete | 3.3 | M3 | 3,635 ₹11,995.5 Lowest | 4,500 ₹14,850 | 4,067.75 ₹13,423.58 | 4,500 ₹14,850 | 5,870 ₹19,371 | 5,223 ₹17,235.9 | 4,000 ₹13,200 | 4,821 ₹15,909.3 |
| 8.00 | M-100.Brick work in 1:4 C:M i/c all cost of labour, material, T&P etc. complete | 19 | M3 | 4,270 ₹81,130 | 4,500 ₹85,500 | 3,517.01 ₹66,823.19 Lowest | 3,900 ₹74,100 | 5,075 ₹96,425 | 4,510 ₹85,690 | 4,800 ₹91,200 | 4,169 ₹79,211 |
| 9.00 | Centering & shuttering for R.C.C. work i/c all cost of labour, material and T&P etc. complete | 35 | M2 | 618 ₹21,630 | 800 ₹28,000 | 540.87 ₹18,930.45 Lowest | 615 ₹21,525 | 780 ₹27,300 | 710 ₹24,850 | 660 ₹23,100 | 641 ₹22,435 |
| 10.00 | Providing & laying R.C.C (M-20)1:1.5:3 i/c all cost of labour, material, T&P etc. complete | 14.5 | M3 | 5,660 ₹82,070 | 6,000 ₹87,000 | 4,964.97 ₹71,992.07 Lowest | 5,650 ₹81,925 | 7,167 ₹1,03,921.5 | 6,380 ₹92,510 | 6,800 ₹98,600 | 5,885 ₹85,332.5 |
Tender Value
₹4.8 L
EMD Value
₹10,000
Closing Date
20 Nov 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ID Moradabad
EE ID Moradabad
Re-Construction of V.R.B. at km. 5.017 of Changeri Minor offaking from Mahmoodpur Dy. At km 23.945.
2025_UPIDC_1090189_1
3807/IDMBD/E-Tender/25-26 Dt. 01.11.2025
Open Tender
Civil Works - Canal
Item Wise
15 days
Moradabad
As per NIT
2 documents required · 2 mandatory
₹589
₹10,000
29 Nov 2025
14 Nov 2025
20 Nov 2025
14 Nov 2025
20 Nov 2025
14 Nov 2025
Amount
Earth work in filling for making diversion in all type of soil i/c all lead & lift, dressing compaction etc. complete
Providing & Laying Ist class brick on edge soling 110 mm thick i/c cost of all material, labour, T&P etc complete
Dismantling brick masonry in lime or cement i/c stacking within 60m etc. complete
Dismantling R.B or R.C.C work i/c stacking within 60m etc. complete
Earth work in excavation of foundation i/c initial lead & lift etc. complete
Centering & shuttering for C.C. work i/c all cost of labour, material and T&P etc. complete
Providing & laying P.C.C 1:3:6 in foundation i/c all cost of labour, material, T&P etc. complete
M-100.Brick work in 1:4 C:M i/c all cost of labour, material, T&P etc. complete
Centering & shuttering for R.C.C. work i/c all cost of labour, material and T&P etc. complete
Providing & laying R.C.C (M-20)1:1.5:3 i/c all cost of labour, material, T&P etc. complete
S/P steel reinforcement for R.C.C work i/c all cost of material,labour, cutting, bending, binding etc.. Complete
Providing & laying P.C.C 1:6:12 i/c all cost of labour, material, T&P etc. complete
P/L struk deep pointing in 1:2 C;M i/c all cost of labour, material, T&P etc. complete
S/F Drainage spout P.V.C 75 mm dia pipe i/c all cost of labour, material, T&P etc. complete
S/F 25 mm thick expension joints i/c all cost of labour, material, T&P etc. complete
S/Laying Tar felt in 3 layer for bearing slab i/c all cost of labour, material, T&P etc. complete
S/Laying wheel guard stone i/c all cost of labour, material, T&P etc. complete
Dismantling Ist class brick on edge soling 110 mm thick i/c all cost of labour, material, T&P etc. complete
Earth work in filling for making ramp (to be used dismantling material & diversion removed material) i/c all cost of material, labour, T&P etc.complete
Laying brick on edge soiling on ramp i/c all cost of labour, material, T&P etc. complete
Laying brick on edge soiling with old brick i/c all cost of labour, material, T&P etc. complete
Earth work in removing diversion with initial lead & lift i/c all cost of labour, material, T&P etc. complete
P/Laying C.C (M-20)1:1.5:3 in wearing coat i/c all cost of labour, material, T&P etc. complete
V K CONTRACTOR (BID ID -5686997)
M/S KUNWAR PAL CONTRACTOR (BID ID -5685523)
M/S MALIK CONSTRUCTION (BID ID -5687837)
R.A.V. BUILDERS AND CONSULTANT (BID ID -5688855)
HINWAR CONSTRUCTION CO (BID ID -5688483)
SAEED AHMED CONTRACTOR (BID ID -5687132)
M/S DEVENDRA PAL SINGH (BID ID -5688752)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
BOQ_2002569.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .