Tender Value
₹3.9 L
EMD Value
₹7,760
Closing Date
10 Aug 2026, 6:00 pm
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_317816_4
e-NIT No. 85 REW UDHAMPUR of 2026-27 Dated 25-07-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹7,760
25 Jul 2026
25 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.70% H.R & 30% A.K | 13.59 | cum | 537.16 | ₹7,300 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:70% H.R & 30% A.k | 28.93 | cum | 644.9 | ₹18,656.96 |
| 3 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 2.46 | cum | 4,826.5 | ₹11,873.19 |
| 4 | P/L of RR stone masonary laid in 1:6 cement mortar | 34.15 | cum | 5,402.9 | ₹1,84,509.03 |
| 5 | 12 mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 67.86 | sqm | 362.65 | ₹24,609.43 |
| 6 | P/L C.conc. Flooring 1:2:4mix using 20 mm nominal size of stone | 21.47 | sqm | 562.15 | ₹12,069.36 |
| 7 | P/L in positionReinforced Cement conc. 1 cement:1.5fine sand:3graded crushed stone agg.20nominal size(1:5:10) excluding the cost of centring & shuttering for slab. | 1.48 | cum | 9,821.85 | ₹14,536.34 |
| 8 | Providing tar steel reinforcement including cutting bending binding etc | 133.18 | kg | 123.2 | ₹16,407.78 |
| 9 | Providing centering and shuttering including struting ,propping etc for slab | 6.71 | sqm | 718.2 | ₹4,819.12 |
| 10 | Providing centering and shuttering including propping struting etc. for edges of slab | 25 | mtr | 262.2 | ₹6,555 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1043630.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].