| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | -36.70% | ₹3.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.3 L+₹22,819.77 (7.42%)Admitted-Fee/PreQual/Technical/Finance | -32.00% | ₹3.3 L+₹22,819.77 (7.42%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹32,530.31 (10.6%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.4 L+₹32,530.31 (10.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.4 L+₹32,535.16 (10.6%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.4 L+₹32,535.16 (10.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹3.4 L+₹32,535.16 (10.6%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.4 L+₹32,535.16 (10.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
Closing Date
13 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW SPN
EXECUTIVE ENGINEER REW SPN
C/O FENCNG AROUND NTPHC BUILDING AT GATIPORA
2026_RDPR_319396_37
Enit 068 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Shopian
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Rural Development and Panchayati Raj
Exempted
14 Sept 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including cutting of shrubs etc. dismantling of old damaged bund and dewatering and Head Load.(subject to actual) | - | Lab | - | - |
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:(All kinds of soil ) | - | Cum | - | - |
| 0.0 | Supply and Placing of Stone Soling hand packed tightly in bed and concrete including levelling & ramming and carriage | - | Cum | - | - |
| 0.0 | Placing and laying in position PCC of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size).CRUSHED Agg | 1 | Cum | - | - |
| 0.0 | Providing and fixing Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | sqm | - | - |
| 0.0 | Structral steel work welded in builtup sections framed works incl cutting, hoisting fixing in position incl priming coat. | - | KG | - | - |
| 0.0 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge. Made of G.I. wire of dia 3 mm | 1 | sqm | - | - |
| 0.0 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. | 1 | sqm | 1 | ₹1 |
| 0.0 | Provision for signboard & photographs and other unforseen items | - | Job | - | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1058572.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .