| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹20.9 Cr | L1 | Accepted-AOC awarded for first phase work out of total contract value to party |
| 2 | L2₹23.3 CrRejected-AOC | ₹23.3 Cr | L2 | Rejected-AOC not awarded |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
23 Feb 2022, 2:00 pmClosed
Managing Director
Assam Gas Company Limited Duliajan, Dibrugarh
HIRING SERVICES FOR DIRECT ASSESSMENT ECDA ICDA SCCDA INSPECTION FOR NATURAL GAS TRUNK PIPELINES OF AGCL
2022_ICD_23985_1
AGCL/PL/TENDER/DA/27/2021/02
Open Tender
Oil/Gas
730 days
Duliajan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹5 L
Yes
AGCL Guwahati Office
2 Jun 2022
7 Jan 2022
23 Feb 2022
7 Jan 2022
23 Feb 2022
21 Jan 2022
8 Jan 2022 - 18 Jan 2022
21 Jan 2022
Amount
PART-I: DIRECT ASSESSMENT (DA) SURVEY OF NATURAL GAS PIPELINES
For 550 mm NB Natural Gas Pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 500 mm NB Natural Gas Pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 400 mm NB Natural Gas Pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 350 mm N.B. Natural Gas pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 300 mm N.B. Natural Gas pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 200 mm N.B. Natural Gas pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 150 mm N.B. Natural Gas pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
For 100 mm N.B. Natural Gas pipeline.
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
PART II: CONTINGENT ITEM OF DA SURVEY- SUPPLY AND INSTALLATION OF COLD REPAIR COMPOSITE SLEEVES
Supply of Composite Repair Sleeve Kit
For 550 mm (22”) O.D. Pipeline For Normal Operating Temperature only
For 500 mm (20”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 400 mm (16”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 350 mm (14”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 300 mm (12”) O.D. Pipeline For Normal Operating Temperature only
For 200 mm (8”) O.D. Pipeline For Normal Operating Temperature only
For 150 mm (6”) O.D. Pipeline For Normal Operating Temperature only
For 100 mm (4”) O.D. Pipeline For Normal Operating Temperature only
Supply of adhesive and filler material
For 550 mm (22”) O.D. Pipeline For Normal Operating Temperature only
For 500 mm (20”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 400 mm (16”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 350 mm (14”) O.D. Pipeline
For Normal Operating Temperature
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
For 300 mm (12”) O.D. Pipeline For Normal Operating Temperature only
For 200 mm (8”) O.D. Pipeline For Normal Operating Temperature only
For 150 mm (6”) O.D. Pipeline For Normal Operating Temperature only
For 100 mm (4”) O.D. Pipeline For Normal Operating Temperature only
Supply of Magnetic Marker Bands (Applicable for piggable pipelines only, for which intelligent pigging is envisaged in the future)
For 500 mm (20”) O.D. Pipeline
For 400 mm (16”) O.D. Pipeline
For 350 mm (14”) O.D. Pipeline
For 300 mm (12”) O.D. Pipeline
Mobilization / Demobilization of Crew (This item is activated only if repair job is planned by the Owner, beyond the DA Project time-period)
Repairing of defective location, Coating Removal and Surface preparation for repair installation, Inspection using UT Wall Thickness Meter and Magnetic Particle Inspection and submitting Repair Report to the Owner on per defect location wise. (Digging of the pipeline will be done by AGCL)
For 550 mm N.B. Natural Gas pipeline
For 500 mm N.B. Natural Gas pipeline
For 400 mm N.B. Natural Gas pipeline
For 350 mm N.B. Natural Gas pipeline
For 300 mm N.B. Natural Gas pipeline
For 200 mm N.B. Natural Gas pipeline
For 150 mm N.B. Natural Gas pipeline
For 100 mm N.B. Natural Gas pipeline
MARR ASSOCIATES PIPELINE INTEGRITY LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx