Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹80,442 (19.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.1 L+₹91,944 (21.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.3 L+₹1.1 L (25.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹6.1 L+₹1.9 L (45.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹7.8 L
EMD Value
₹15,540
Closing Date
17 Aug 2026, 4:00 pmClosed
ER Mohd Iqbal Ganie
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_317410_6
NIT 32 Of 2026-27 Dated 23-07-2026
Open Tender
Civil Works
Percentage
Executive Engineer PWD RnB Division Banihal
Refer to NIT
3 documents required · 3 mandatory
₹300
Executive Engineer PWD RnB Division Banihal
₹15,540
Executive Engineer PWD RnB Division Banihal
27 Aug 2026
23 Jul 2026
18 Aug 2026
23 Jul 2026
17 Aug 2026
23 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of Soil | 0.84 | Cum | 479.3 | ₹402.61 |
| 0.0 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 9 | Cum | 1,740.45 | ₹15,664.05 |
| 0.0 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 1 | sqm | 57 | ₹56.94 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.5 | Cum | 5,733.6 | ₹25,801.2 |
| 0.0 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 10.02 | Cum | 7,877.4 | ₹78,931.55 |
| 0.0 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand) | 50 | sqm | 327.85 | ₹16,392.5 |
| 0.0 | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Raised and cut pointing | 45 | sqm | 541.7 | ₹24,376.5 |
| 0.0 | Pointing on brick work or brick flooring with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled/Struck or weathered Pointing | 43.65 | sqm | 200.8 | ₹8,764.92 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 1.35 | Cum | 7,788.4 | ₹10,514.34 |
| 0.0 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 983 | Kg | 138.2 | ₹1,35,850.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1040112.xls
BOQ • 0.32 MB
Extensionaugust.pdf
PDF • 0.51 MB
Corrigendumitr.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .