| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹72.4 CrAccepted-AOC NO 1387 1 EDICIA JEEVANANDHAM STREET MOSAKKAVUNDANPALAYAM ERODE 638002 TAMIL NADU | ERODE | ERODE | TAMIL NADU | 638002 | ₹72.4 Cr Quoted ₹74.8 Cr | 1 | Accepted-AOC Accepted |
| 2 | 2₹77.5 Cr+₹2.6 Cr (3.54%)Rejected-AOC SAKTHI MAHAL NO 63 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | ₹77.5 Cr+₹2.6 Cr (3.54%) | 2 | Rejected-AOC Rejected |
| 3 | 3₹78.4 Cr+₹3.6 Cr (4.81%)Rejected-AOC | ₹78.4 Cr+₹3.6 Cr (4.81%) | 3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | R R THULASI BUILDERS INDIA P LTD L2 | SREE BALAJI ASSOCIATES PRIVATE LIMITED L1 | N.S.PERIASAMY AND CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.Upto 0-2m depth | 18,926 | CUM | 280 ₹52,99,280 | 250 ₹47,31,500 Lowest | 285 ₹53,93,910 |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sites and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.
Data Worked out for 54 m3 per day/8 hrs. Upto 2.40-3.30m depth | 190 | CUM | 380 ₹72,200 | 350 ₹66,500 Lowest | 385 ₹73,150 |
| 2.10 | Upto 3.30-4.30m depth | 133 | CUM | 420 ₹55,860 | 400 ₹53,200 Lowest | 425 ₹56,525 |
| 2.20 | Above 4.30m depth | 27 | CUM | 450 ₹12,150 | 400 ₹10,800 Lowest | 465 ₹12,555 |
| 3.00 | Supplying and filling in foundation and basement, etc with Crushed Stone sand (M-Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,444 | CUM | 1,900 ₹27,43,600 | 1,850 ₹26,71,400 Lowest | 1,925 ₹27,79,700 |
| 4.00 | Providing Anti-termite treatment to soil adiecent and under building foundation, plinth periphery of the building by application of chemicals of IS 6313 Part I to IV in stages to suit the progress of work consist as per the detailed specification as below. (Measurements taken for the plinth area for the purpose of payment) including breaking of termite mounds, making holes with crow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport and storing, etc., complete and as directed by the departmental officers.(The chemical should be got approved by Executive Engineer before use on work).Stage-1: Spraying anti-termite chemical solution for the foundation before laying concrete, in bottom and sides of foundation.Stage-2: Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth.Stage-3: Spraying anti-termite chemical solution on the sand for the flooring before laying the flooring concrete. This treatment has to be carried out on the sand filling by making holes with crow bar to a depth of 60cms and at 60cms intervals on both direction and at iunction of wall and flooring thoroughout.Stage-4: Spraying anti-termite chemical solution alround building outside by making holes through bar before laying plinth protection and the holes to be closed after the treatment | 5,800 | SQM | 140 ₹8,12,000 Lowest | 150 ₹8,70,000 | 155 ₹8,99,000 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 7,105 | CUM | 455 ₹32,32,775 | 450 ₹31,97,250 Lowest | 465 ₹33,03,825 |
| 6.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 1,415 | CUM | 170 ₹2,40,550 | 150 ₹2,12,250 Lowest | 165 ₹2,33,475 |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 1,606 | CUM | 5,720 ₹91,86,320 | 5,650 ₹90,73,900 Lowest | 5,835 ₹93,71,010 |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 12,224 | SQM | 730 ₹89,23,520 Lowest | 750 ₹91,68,000 | 775 ₹94,73,600 |
Tender Value
₹72.5 Cr
EMD Value
₹36.4 L
Closing Date
27 Feb 2026, 3:00 pmClosed
Joint Commissioner/Executive Officer
Arulmigu Dhandayuthapani swamy Temple, Devasthanam Head Office, North Giriveethi, Adivaram, Palani
Construction of New Devotees Rest Houses For Arulmigu Dhandayuthapani Swamy Temple at Palani, Dindigul District
2026_HRCE_656005_1
8/2025-2026
Open Tender
Civil Works - Buildings
Lump-sum
730 days
Palani
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹36.4 L
Palani
13 Mar 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
27 Feb 2026
23 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.Upto 0-2m depth | 18,926 | CUM | - | - |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sites and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers.
Data Worked out for 54 m3 per day/8 hrs. Upto 2.40-3.30m depth | 190 | CUM | - | - |
| 2.1 | Upto 3.30-4.30m depth | 133 | CUM | - | - |
| 2.2 | Above 4.30m depth | 27 | CUM | - | - |
| 3 | Supplying and filling in foundation and basement, etc with Crushed Stone sand (M-Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,444 | CUM | - | - |
| 4 | Providing Anti-termite treatment to soil adiecent and under building foundation, plinth periphery of the building by application of chemicals of IS 6313 Part I to IV in stages to suit the progress of work consist as per the detailed specification as below. (Measurements taken for the plinth area for the purpose of payment) including breaking of termite mounds, making holes with crow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport and storing, etc., complete and as directed by the departmental officers.(The chemical should be got approved by Executive Engineer before use on work).Stage-1: Spraying anti-termite chemical solution for the foundation before laying concrete, in bottom and sides of foundation.Stage-2: Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth.Stage-3: Spraying anti-termite chemical solution on the sand for the flooring before laying the flooring concrete. This treatment has to be carried out on the sand filling by making holes with crow bar to a depth of 60cms and at 60cms intervals on both direction and at iunction of wall and flooring thoroughout.Stage-4: Spraying anti-termite chemical solution alround building outside by making holes through bar before laying plinth protection and the holes to be closed after the treatment | 5,800 | SQM | - | - |
| 5 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 7,105 | CUM | - | - |
| 6 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 1,415 | CUM | - | - |
| 7 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 1,606 | CUM | - | - |
| 8 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 12,224 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
part1.pdf
Tender Documents • 1.28 MB
Dreawings.pdf
Additional Documents • 6.94 MB
2.pdf
Tender Documents • 1.48 MB
BOQ_786673.xls
BOQ • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .