Tender Value
₹35.9 L
EMD Value
₹35,900
Closing Date
15 Nov 2021, 2:00 pmClosed
CE/TTPS/SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
EM I 250MVA 15.75kV 230kV Three phase Generator Transformer Arresting oil leak in the flanges of LV turret and bell mouth Radiator oil leak arresting fabrication of new stainless steel LV turret SS 316 L for rectification of eddy current issue
2021_EB_212535_1
CE / TTPS /SE/ES/ F.Specn.244/2021-22
Open Tender
Electrical Works
Item Rate
30 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹35,900
Yes
22 Nov 2021
29 Oct 2021
16 Nov 2021
29 Oct 2021
15 Nov 2021
29 Oct 2021
Charges for Dismantling and Assembling of HT/LT Terminal links of 250MVA GT
Charges for Transportation of the 10 KL oil storage tank from repair bay to transformer yard & return back to its original position.
Charges for Transporting of empty oil barrels from Store to Unit II transformer yard including Loading and unloading (276 barrels)
Providing private filter machine of the capacity of 10000 Ltrs per hour or above for oil filtration work, providing power supply connection, providing lighting arrangement. After completion of filtration, disconnection of the power supply, removal of lighting arrangements
Draining of Transformer oil from main tank of Three Generator Transformer
Charges for releasing and re erecting the rubber bellows in the 15.75 KV Bus-Duct at Three phase GT
Charges for releasing and erection of 800A /1250A HV Bushings with new gaskets in Generator Transformer HV turrets
Charges for Dismantling the LV flexible links between LV bushing and LV winding of the GT
Charges for Dismantling and Assembling the equalizing pipe lines, inspection cover in the LV chamber 6 Nos and LV turret fixes in GT
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of supporting insulators and internal cleaning of 15.75KV Busduct of GT
Moving 250 MVA/15.75 KV/230 KV,3 phase GT from plinth to 20 mtrs(approx) away (210 Tons X 40 mtrs)= 8400 T/M and return back to original position.
Charges for Dismantling the LV turret, LV Bushings, superficial cleaning of LV bushings and replacement of new gaskets and reassembling in GT.
Charges for Dismantling and assembling of conservator tank, breather lines, valves and bucholz lines of GT
Charges for Dismantling of Transformer top cover, cleaning replacement of new gasket and reassembling
Fabrication of new stainless steel LV turrets (SS 316 L) to main tank for avoiding eddy current including cost of materials
Erection of scaffolding, a height of 12 mts and dismantling after completion of work and shed arrangements for transformer rectification work
Nitrogen gas purge out with vacuum capping for remove the moisture and improve Generator Transformer winding
Charges for Vacuum pulling, Oil filling and hot oil circulation main tank, radiators & combined circulation up to reaching of parameters to the satisfactory level in GT
Dismantling of LAS stacks one by one after disconnecting the jumper connection
Assembling of LAS stacks one by one after connecting the jumper connection and assisting with MRT testing
Fabrication of additional equalizing pipe line from LV turret to conservator tank for free flow
Radiator oil leak arresting in GT: Dismantling of radiator from top & bottom headers in generator Transformer, renewal of all gaskets in the leaky radiator header valves and re-erection radiator with the headers after completion of work
Charges for Assembling the LV flexible links between LV bushing and LV winding of the GT
Loading , transporting of heavy 9'' ×10"×5" sized teakwood sleepers from the pocket store, unloading at the repair bay & lifting, shifting and placing of GT bell cover on the sleeper woods after completion of the open inspection - again the bell cover lifting, shifting and positioning on the transformer base compartment and tightening the all bolts and nuts
Charges for Transporting of empty oil barrels from Unit-II transformer yard to Store after completion of work including Loading and unloading (276 barrels)
Scrapping, cleaning and Painting the Entire Transformer surface with 2 coats of DA grey enamel paint in Three phase GT (Paint under Contractor Scope )
Hire Charges of faun crane for lifting the bell mouth flange of 3 phase GT from unit-II transformer yard to repair pay
Hire Charges of faun crane for reassembling the bell mouth flange of 3 phase GT from repair pay to unit-II transformer yard
Providing 50 mm globe valve for new fabrication equalizing pipeline (Material under Contractor Scope)
Providing SS bolt nut for insulating LV turret from main tank to avoid eddy current (Material under Contractor Scope)
Providing Nitrile rubber bond Cork gasket 1040X1040X3mm (Material under Contractor Scope)
Providing Nitrile rubber bond Cork gasket 1040X1040X6mm (Material under Contractor Scope)
Providing Nitrile rubber bond Cork gasket 1040X1040X10mm (Material under Contractor Scope)
Providing Nitrile rubber bond Cork gasket 1040X1040X16mm (Material under Contractor Scope)
SHREE ABIRAMI ENGGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
PDF • 0.02 MB
tech_eval.pdf
PDF • 0.03 MB
fin_bid_open.pdf
PDF • 0.02 MB
boq_comp_chart.xlsx
xlsx • 0.01 MB
fin_eval.pdf
PDF • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .