| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC BAIRGANV HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L1 | Accepted-AOC S.K Contractor | |
| 2 | L2₹1.5 L+₹48,775 (48.1%)Rejected-Finance SANTOBI MATA GALI MURSAN HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L2 | Rejected-Finance Reject | |
| 3 | L3₹1.6 L+₹61,725 (60.9%)Rejected-Finance NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L3 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
20 Apr 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
EDC HATHRAS
Bussiness Plan
2023_DVVNL_797145_1
EDCH-01/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL WEBSITE
₹2,000
2 Apr 2025
13 Apr 2023
20 Apr 2023
13 Apr 2023
20 Apr 2023
13 Apr 2023
Amount
Safe Carriage of following material from Electricty store center Hathras to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5/9 Mtr. Long PCC Pole
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Safe Carriage of following Different Capacity T/F from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
250 KVA T/F
100 KVA T/F
Dismentling of damaged following accessories
100/160KVA T/F
Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Double pole complet fitting
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and Nozzling / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
11 KV XLPE Cable Size 3*400
LT PVC CABLE 3*150
Fixing of Following Material
Fuse Set
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Safe Installation of following New/Repaired cousted T/F on newly constructed double pole in proper alignment direction & making all HT/LT connection.
100 KVA T/F
250 KVA T/F
Construction of round plinth around the S.T. Poles / RS Joists / Rails/PCC will be done with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. the ground). The plinth should be plastered with ½ inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. The rate will include all cost of material, labour and T&P etc. for completion of the above work which will be provided by the contractor at his own cost.
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Pipe earthing of 250/400 KVA medium Power Transformers
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
Back Cartage from Dump Side to Store Center Hathras
100/160 KVA T/F
Line Meterial Scrape XLPE Cable
GOSWAMI ENTERPRISES
R.N. ELECTRICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .