Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.5 LAdmitted-Finance | -15.00% | ₹29.5 L | L1 | Admitted-Finance |
| 2 | L2₹34.7 L+₹5.2 L (17.6%)Admitted-Finance | -0.02% | ₹34.7 L+₹5.2 L (17.6%) | L2 | Admitted-Finance |
| 3 | L3₹35.8 L+₹6.2 L (21.2%)Admitted-Finance | +3.00% | ₹35.8 L+₹6.2 L (21.2%) | L3 | Admitted-Finance |
| 4 | L4₹36.5 L+₹6.9 L (23.5%)Admitted-Finance VILLAGE DHANGRI TEHSIL DISTRICT RAJOURI | RAJOURI | RAJOURI | JAMMU AND KASHMIR | +5.00% | ₹36.5 L+₹6.9 L (23.5%) | L4 | Admitted-Finance |
Tender Value
₹34.7 L
EMD Value
₹69,440
Closing Date
21 Jul 2026, 4:00 pmClosed
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
a Upgradation of Hall in Shiv Mandir Gujjar Nagar b Construction of Toilet Block at Abu Bakar Masjid c Construction Upgradation of lanes drains along with RCC coverings and other allied works in ward no 6 Jammu.
2026_HAUDD_314334_16
Division No. 1/JMC/26-27/e-NIT No. 25
Open Tender
Civil Works
Percentage
Ward No. 06.
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Yes
Chief Accounts Officer FA JMC Town Hall Jammu
₹69,440
22 Aug 2026
3 Jul 2026
22 Jul 2026
3 Jul 2026
21 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.87 | cum | 9,395.7 | ₹17,569.96 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 34.3 | cum | 9,821.85 | ₹3,36,889.45 |
| 3 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D or more. Quantity @ 100 Kgs per cum of RCC. | 4,194.85 | kg | 123.2 | ₹5,16,805.52 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for:Columns, pillars, piers, abutments, posts and struts. | 24.54 | sqm | 742.55 | ₹18,222.18 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 35.73 | sqm | 577.55 | ₹20,635.86 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms | 149.47 | sqm | 718.2 | ₹1,07,349.35 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls11.1 Under 20 cm wide | 86.89 | m | 262.2 | ₹22,782.56 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Stairs (excluding landings) except spiral staircases. | 7.43 | sqm | 851.15 | ₹6,324.04 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in:Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 39.26 | cum | 7,571.55 | ₹2,97,259.05 |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 39.26 | cum | 1,455.65 | ₹57,148.82 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_1018083.xls
BOQ • 0.39 MB
EMD3DLP.pdf
PDF • 0.64 MB
CORRIGENDUM.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .