| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | ₹25.7 L | L1 | Accepted-AOC L1 Agency |
| 2 | L2₹27.2 L+₹1.5 L (5.95%)Rejected-Finance VPO KALIYANA TEHSIL AND DISTT CHARKHI DADRI 127306 | KALIYANA | CHARKHI DADRI | HARYANA | 127306 | ₹27.2 L+₹1.5 L (5.95%) | L2 | Rejected-Finance Due to Higher Rate |
| 3 | L3₹28.2 L+₹2.5 L (9.67%)Rejected-Finance | ₹28.2 L+₹2.5 L (9.67%) | L3 | Rejected-Finance Due to Higher Rate |
Tender Value
₹32.9 L
EMD Value
₹65,820
Closing Date
20 Apr 2026, 5:00 pmClosed
ANKIT VASHISHT
MC CHARKHI DADRI
De-silting repairing and Maintenance of exiting Nala in MC Charkhi Dadri.
2026_HRY_514668_1
202668A6DE5C 7B85 47C6 997D E32DFAA5E0D6341ULB
Open Tender
Civil Works
Works
90 days
Charkhi Dadri
2 documents required · 2 mandatory
₹2,500
₹65,820
Yes
13 May 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
HSR Rate(Rs.) 83.00 Through Rate | - | cum | - | - |
| 2 | HSR Item 6.16-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). HSR Rate(Rs.) 6113.00 Through Rate | - | cum | - | - |
| 3 | HSR Item 11.11.2-12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand)
HSR Rate(Rs.) 135.00 Through Rate | - | Sqm | - | - |
| 4 | HSR Item 13.29.2-Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg. | - | - |
| 5 | HSR Item 6.34.3-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars
HSR Rate(Rs.) 68.00 Through Rate | - | Kg. | - | - |
| 6 | HSR Item 14.67-Hoisting and placing precast R.C. concrete slab or stones in position on outlets or W.C. culverts by mechanical/ mannual means
HSR Rate(Rs.) 81.00 Through Rate | - | each per outlet | - | - |
| 7 | HSR Item 7.20.1-Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
HSR Rate(Rs.) 4287.00 Through Rate | - | cum | - | - |
| 8 | HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
HSR Rate(Rs.) 208.00 Through Rate | - | Sqm | - | - |
| 9 | HSR Item 3.1.3-By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge
HSR Rate(Rs.) 108.00 5km | - | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_593498.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .