| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.8 Laccepted-aoc | ₹2.8 L | accepted-aoc |
Tender Value
₹3.3 L
EMD Value
₹8,200
Closing Date
9 Mar 2026, 4:00 pmClosed
Executive Officer
SASD Kondagattu
Laying of RCC pipeline from Seethamma Kanneetidhara to Vehicle parking
683739
C/651/2025
OPEN
Drainage Work
JAGITIAL, TELANGANA
6 documents required · 6 mandatory
₹117
₹8,200
24 Mar 2026
1 Mar 2026
1 Mar 2026
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m, including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO.308)
Supply and filling of Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost of sand, all operational, incidental, labour charges, complete for finished item of work, including cost and conveyance of all materials and labour charges, and contractors profit & over heads, but excluding seigniorage charges & taxes like GST etc. , complete. (APSS NO. 309 & 310)
Manufacture, supply and delivary of RCC Spun/vibrated cost(Reinforced) socket and spigot pipes to BIS 458/2003 at ex-factory (rate per meter of effective length excluding transportation and taxes single socket 1'-0" dia (NP-3) 300mm dia
Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification
Refilling filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work, including cost and conveyance of all materials and labour charges,and contractors profit & over heads, but excluding seigniorage charges & taxes like GST etc. , complete. (APSS NO. 309 & 310)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
RCC pipeline from Seethamma kanneeti dhara BOQ.xls
TENDER_DOCUMENT • 0.03 MB
RCC pipeline Seethamma kanneeti dhara BID.doc
TENDER_DOCUMENT • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .