| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC lower rate |
| 2 | Rejected-Technical SIRKOI BHUD MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | - | - | Rejected-Technical NON RESPONSIVE BIDER |
Tender Value
₹4.2 L
EMD Value
₹42,000
Closing Date
28 May 2026, 12:00 pmClosed
EE PD PWD MBD
EE PD PWD MBD
543-1-Pradesh ki Tahsilon mein nyayik Tahsildar AVN Nayab Tahsildar ki upyog aur Tahsilon mein prithak Shauchalay ki vyavastha ke kram mein Tahsil Moradabad Parisar Mein Shauchalay ka Nirman Karya
2026_CEMBD_1151062_1
543/E-NIVIDA/2026-27 DATE 11-05-2026
Open Tender
Civil Works - Buildings
MORADABAD
543-1-Pradesh ki Tahsilon mein nyayik Tahsildar AVN Nayab Tahsildar ki upyog aur Tahsilon mein prithak Shauchalay ki vyavastha ke kram mein Tahsil Moradabad Parisar Mein Shauchalay ka Nirman Karya
2 documents required · 2 mandatory
₹677
₹42,000
Yes
1 Jul 2026
21 May 2026
28 May 2026
21 May 2026
28 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation.S.I. No. 251 | 38.63 | cum | 110 | ₹4,249.3 |
| 2 | Cement Concrete with 4 cm gauge with stone ballast coarse sand & Cement in proportion 8:4:1 in foundation i/c supply of all material, labour & T&P required for proper completion of the work S.I. No. 281 | 1.79 | cum | 5,750 | ₹10,292.5 |
| 3 | Cement Concrete with 2 cm gauge stone grit / single course sand and cement in proportion of 4:2:1 including supply of all material labour & T&P etc. required for proper completion of the work SI.No. 279 (a) | 3 | cum | 6,700 | ₹20,100 |
| 4 | M-150 brick work in One cement and Three course sand mortar in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work SI.No. 307 | 10 | cum | 5,150 | ₹51,500 |
| 5 | 4cm thick damp proof coarse cement and approved coarse 1:2 with and including water proofing material as odered by the Engineer in charge including supply of all material, labour and T&P etc required for proper completion of the work and including proper curing & shuttering as necessary S.I. No. 360(c) | 3.13 | sqm | 330 | ₹1,032.9 |
| 6 | M-150 brick work in in 1:6 (one cement and four fine sand of 1.25 F.M. mortar) Superstructure including supply of all materials, labour & T&P required for proper completion of work & also including labour cess, Royalty etc complete.S.I. No. 309 | 11 | cum | 5,215 | ₹57,365 |
| 7 | R.C.C. work with Cement coarse sand and 20mm. Gauge grit in prop. 1:1.5:3 in slab excluding cost of reinforcement but including Centering and Shuttering , binding the same and cost og binding wire, supply of all material, labour, T&P. etc. complete. | 8.5 | cum | 7,900 | ₹67,150 |
| 8 | Mild steel or iron in plain work such as reinforced or reinforce brick work (when not included in an over all rates) wrougth to required shape of necessary including bending for proper complection of the work and including supply of all steel etc. complete. | 9 | Qtl. | 7,330 | ₹65,970 |
| 9 | 12 mm thick plaster with cement and approved course sand in proportion 1:3 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work SI.No. 583. | 111 | sqm | 200 | ₹22,200 |
| 10 | Providing and laying vitrified floor tiles (BELL/KAJARIA/SOMANI or other standared make) in different sizes (thickness to be specified by the manufacturer) with water absoption's less than 0.80 % and conforming to IS : 15622 of approved make in all colour and shades laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 coarse sand) including grouting the joints with white cement and matching pigments etc complete size of tiles 25x25 cm. S.I. No. New Item 4 Ch. 14 | 45 | sqm | 1,350 | ₹60,750 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 3.89 MB
BOQ_2156016.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid