Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-Finance | ₹29.7 L | L1 | Accepted-Finance DUE TO BELOW RATE |
| 2 | L2₹29.9 L+₹15,621.89 (0.53%)Rejected-Finance | ₹29.9 L+₹15,621.89 (0.53%) | L2 | Rejected-Finance DUE TO ABOVE RATE |
| 3 | L3₹29.9 L+₹20,428.62 (0.69%)Rejected-Finance | ₹29.9 L+₹20,428.62 (0.69%) | L3 | Rejected-Finance DUE TO ABOVE RATE |
Tender Value
₹30.0 L
EMD Value
₹3.0 L
Closing Date
17 Aug 2026, 5:00 pmClosed
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of Nala ward no 13 Moh. Bakshiwala /Bakli From Raiway Fatak To Bakli Talab Bijnor
2026_DOLBU_1172979_6
134/ET-NPPB/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
EO NPP BIJNOR
Construction of Nala ward no 13 Moh. Bakshiwala /Bakli From Raiway Fatak To Bakli Talab Bijnor
2 documents required · 2 mandatory
₹854
EO NPP BIJNOR
₹3.0 L
27 Aug 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in ordinary soil. i/c of all material,labour and T&P etc.all complete at Site | 478.13 | cum | 180 | ₹86,064.12 |
| 2 | Disposal of excavated earth with cartage upto distance km i/c loading and unloading of item NO 01 i/c supply of all material labour and T&P etc all complete at site 90% | 478.13 | cum | 146.2 | ₹69,903.19 |
| 3 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 60.37 | Cum | 6,720 | ₹4,05,686.4 |
| 4 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 264.44 | Cum | 5,310 | ₹14,04,187.02 |
| 5 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 578.4 | Sqm | 215 | ₹1,24,356 |
| 6 | C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 13.26 | cum | 7,400 | ₹98,124 |
| 7 | R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work | 45.09 | Cum | 8,025 | ₹3,61,847.25 |
| 8 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work. | 48.14 | Qtl | 9,431.69 | ₹4,54,041.56 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_2202790.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .