| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | -0.02% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance | +1.50% | ₹4.8 L | L2 | Admitted-Finance |
| 3 | L3₹4.8 LAdmitted-Finance | +2.50% | ₹4.8 L | L3 | Admitted-Finance |
Tender Value
₹4.7 L
EMD Value
₹9,437
Closing Date
28 Nov 2025, 2:55 pmClosed
EXECUTIVE OFFICER LAVA PANCHAYAT SAMITI
OFFICE OF THE EXECUTIVE OFFICER LAVA PANCHAYAT SAMITI
CONSTRUCTION OF COMMUNITY TOILET NEAR RANGPO PLAY GROUND PS 10 DEWAN MEMORIAL PATHSHALA SANGSAY G.P
2025_GTA_941761_2
LVA/eNIT No. 29/APAS/Sangsay G.P/2025-26
Open Tender
CIVIL WORKS
45 days
SANGSAY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹9,437
13 Feb 2026
7 Nov 2025
1 Dec 2025
7 Nov 2025
28 Nov 2025
7 Nov 2025
Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
B.Cost of Boulder
Cement concrete with graded jhama khoa(30 mm size) excluding shuttering in ground floor and foundation 1:3:6 propotion
Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Codes.
Reinforcement for reinforced concrete in all sorts of structures including distribution bars,stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction
Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured)
12 mm thick brick work with first class bricks in cement mortar (1:4) in ground floor
Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface.
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M S Clamp.
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor.
Glazed shutters of doors, windows, fan light, clerestory windows etc. as per design (with ordinary glass of 7.4kg./sq.m. 3mm. Thick) fitted with putty bed and teak wood bead and nails including fitting and fixing shutter in position but excluding the cost of hinges and other fittings. cost of glass, putty, wooded beads etc.will be paid separately. In ground floor.
Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed withcolouringoxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by syntheticadhesive & grout materials etc.
Supplying, fitting & fixing 1st quality Ceramic tiles in walls With Sand Cement Mortar(1:3)15 mm thick and 2mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq m and joint filling using white cement slurry @ 0.20kg /Sqm stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed withcolouringoxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by syntheticadhesive & grout materials etc.
Colour Washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly. External surface
Colour Washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly. Internal surface
Supplying, fitting and fixing Shallow water closet Indian pattern (I.P.W.C.) of approved make in white vitreous chinaware in position (excluding cost of concrete for fixing).
Supplying, fitting and fixing Foot rest for water closet of size 275 mm X 125 mm
Supplying, fitting and fixing 10 litre porcelain low-down cistern of approved make without fittings and brackets.
Supplying Fitting ,Fixing,UPVC pipes A- Type and fittings conforming to Is:13592-1992 with all necessary clamps nails,including making holes in walls, floors etc.
Supplying Fitting ,Fixing,UPVC pipes A- Type and fittings conforming to Is:13592-1992 with all necessary clamps nails,including making holes in walls, floors etc. Bend 87.5 degree 110 mm dia
Supplying P.V.C.water Storage Tank of approved quality with closed top lid (Black) Multilayer
Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (1:4) including two 560 mm dia R.C.C. manhole cover (heavy Type ) of approved maje supplied ,fitted and fixed in the 10mm thick (R.C.C. (1:1.5:3) top slab with necessary fittings 20 mm with clear water ,removing foreign water from the chamber and including constructing attached inspection pit as per approved drawing. For 10 Users
8% for Plumbing
Cost of PIB
18 % including GST
Labour Cess @ 1 % including GST
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.97 MB
BOQ_2229529.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid