Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GRAM AEMANPUR DISTRICT BULANDSHAHR UTTAR PRADESH | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
5 Jul 2021, 5:00 pmClosed
SE EUDC- III (U.P)
Taalkatora power house lesa lucknow
Replacement of damaged Distribution Transformers in the area of E.U.D.D-Aishbagh, LESA CIS Gomti, Lucknow
2021_MVVNL_598384_1
07/E.U.D.C.-III/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Lucknow
As per tender document
2 documents required · 2 mandatory
₹1,180
A/c.No-35140200000129 IFSC-BARBORAJLUC
₹5,000
26 Jul 2021
25 Jun 2021
6 Jul 2021
25 Jun 2021
5 Jul 2021
25 Jun 2021
Amount
Disconnection and removal of Damaged Transformer from present system, safe carriage from site of damage to Transformer work shop Aliganj for DTC. The work includes loading, unloading and safe carriage with in the area of E.U.D.D-Aishbagh.
63 K.V.A. Transformer mounted on double pole/plinth.
100 K.V.A. Transformer mounted on double pole/plinth.
250 K.V.A. Transformer mounted on four pole/plinth.
400 K.V.A. Transformer mounted on four pole/plinth.
630 K.V.A. Transformer mounted on plinth.
990/1000 K.V.A. Transformer mounted on plinth.
Safe carriage of healthy Transformer from store work shop Aliganj to site of damage including loading, unloading, dragging. Mounting, properly connecting to the system and commissioning on load, with in the area of E.U.D.D-Aishbagh.
63 K.V.A. Transformer mounted on double pole/plinth.
100 K.V.A. Transformer mounted on double pole/plinth.
250 K.V.A. Transformer mounted on four pole/plinth.
400 K.V.A. Transformer mounted on four pole/plinth.
630 K.V.A. Transformer mounted on plinth.
990/1000 K.V.A. Transformer mounted on plinth.
Safe carriage of Transformer mobile trolley mounted with Transformer from any Sub-Division or site under E.U.D.D-Aishbagh to damaged Transformer site. Putting it at damaged Transformer to restart the electrical system safely including all electrical work so that supply may be re-started by this troley Transformer.
Safe return carriage of Transformer mobile trolley form damaged Transformer site to Sub-Station or other site (as) the case may be after disconnection the trolley from the electrical system.
Note :- 1 All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2 One carriage including loading/unloading from dump site to pit site is included in scope of work 3 During execution of work all risk will be of the contractor. 4 Contractor will provide all T & P, vehicle and man power. 5 All the old and used material should be taken on book. 6 The quantity may be vary ±10%.
SINGH ENTERPRISES
sidhvinayak traders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .