| 1 | L1₹12.7 LAccepted-AOC | ₹12.7 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹12.8 LRejected-AOC | ₹12.8 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Akash Rajasekar L1 | CHANDRASEKARAN C L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Scrub jungle including removal from ste, disposal by burning etc., complete as directed by the deaprtmental officers. | 576 | Cum | 6.3 ₹3,628.80 | 7 ₹4,032 |
| 2.00 | Earthwork excavation and depositing on bank with initial lead of 10 meters and lift of 2 metres as per SS 20A including breaking clods, sectioning, ramming etc., | 288 | Cum | 140.3 ₹40,406.40 | 145 ₹41,760 |
| 3.00 | Spreading the collected US gravel 100mm thick watering and hand roller rolling including cost and supply of US gravel from approved quarry and stacking to departmental gauge for pre measurement etc., | 72 | Cum | 651.5 ₹46,908 | 655 ₹47,160 |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam 250mm thick including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers 250mm thick with pavers in sub-base/base course on a well prepared sub-base/ base course on well prepared surfcace and compacting with vibratorty soil compactor to achive the desired density including cost of materilas labour charges rebtals for machinery fuel and all other incidental charges etc., complete as per clause 406. | 180 | Cum | 2,760.5 ₹5.0 L | 2,765 ₹5.0 L |
| 5.00 | Providing and laying of prime coat using emulsion at the rate of 7 kg per 10 sqaure meter over the WMM surface preparatory to another bituminous construction over it. | 1,200 | Sqm | 86.8 ₹1.0 L | 88 ₹1.1 L |
| 6.00 | Providing and applying Tack Coat over WMM surface with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50 kg per 10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502 | 1,200 | Sqm | 20.43 ₹24,516 | 23 ₹27,600 |
| 7.00 | Providing and laying Bituminious concrete to 25/30/40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 30 | Cum | 11,903.62 ₹3.6 L | 11,903.62 ₹3.6 L |
| 8.00 | Providing Name board charges | 1 | No | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work} | 1 | GST Amount (in Rupees) | 1,94,061.2 ₹1.9 L | 1,95,382.91 ₹2.0 L |
Updated dates
Tender Value
₹12.8 L
EMD Value
₹12,840
Closing Date
18 Feb 2026, 9:00 amClosed
The Block Development Officer(BP)
Panchayat Union, Ariyalur
Strengthening the road from Vankadakrishnapuram BC mayanam in Venkadakrishnapuram Panchayat
2026_RDTN_659173_1
R.C.NO.A4/1551/2025, Date.11.02.2026
Open Tender
Civil Works - Roads
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹12,840
26 Mar 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
18 Feb 2026
16 Feb 2026
Clearing Scrub jungle including removal from ste, disposal by burning etc., complete as directed by the deaprtmental officers.
Earthwork excavation and depositing on bank with initial lead of 10 meters and lift of 2 metres as per SS 20A including breaking clods, sectioning, ramming etc.,
Spreading the collected US gravel 100mm thick watering and hand roller rolling including cost and supply of US gravel from approved quarry and stacking to departmental gauge for pre measurement etc.,
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam 250mm thick including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers 250mm thick with pavers in sub-base/base course on a well prepared sub-base/ base course on well prepared surfcace and compacting with vibratorty soil compactor to achive the desired density including cost of materilas labour charges rebtals for machinery fuel and all other incidental charges etc., complete as per clause 406.
Providing and laying of prime coat using emulsion at the rate of 7 kg per 10 sqaure meter over the WMM surface preparatory to another bituminous construction over it.
Providing and applying Tack Coat over WMM surface with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 2.50 kg per 10sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
Providing and laying Bituminious concrete to 25/30/40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_790831.xls
BOQ • 0.32 MB
PriceBid1.pdf
Tender Documents • 0.29 MB
TechnicalBid1.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid