Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹723.2 Cr
EMD Value
₹2 Cr
Closing Date
23 Apr 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the"Financial Capacity") of 5% of Estimated ProjectCost at the close of the preceding Financial Year.(Refer clause No. 2.2.2.2 of RFP).
The Bidder shall have the Technical Capacity and Experience as mentioned in Clause No. 2.2.2.1, 2.2.2.3 to 2.2.2.9 of the RFP.
30 conditions · 15 needing a document upload
ANNEXURE I TO APPENDIX IA-(DETAILS OF BIDDER) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) Clause 2.1.4, 2.11 and 3.1.6 of RFP.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID) (Para 2.1.4, 2.11 and 3.1.6 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory.The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) Clause No. 2.1.5 of RFP.
ANNEXURE II TO APPENDIX IA(TECHNICAL CAPACITY OF THE BIDDER): Refer CLAUSE 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
APPENDIX III- Format for power of attorney for lead member of Consortium/Joint venture CLAUSE 2.1.6 of RFP
ANNEXURE III TO APPENDIX IA- (FINACIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINTVENTURE) Clause 2.1.11 of RFP.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS) Refer Clause 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY).
APPENDIX-VII (BID SECURITY)/EMD (REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [epayment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE VI TO APPENDIX IA-(Guidelines of the Department of Disinvestment) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
ANNEXURE VII TO APPENDIX IA-(Department of Expenditure, Ministry of Finance, Government ofIndia letterF.No.6/18/2019-PPD dated:23/07/2020 shall be referred which is enclosed as Annexure-VII of Appendix-IA) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
South Central Railway (Construction Organization)- Engineering, Procurement and Construction (EPC) Contract for Doubling of Track between Bellamkonda station & Nallapadu station including Electrification & Signaling works in connection with Doubling of Guntur- Bibinagar section in the State of Andhra Pradesh.
EPC-11-CAO-C-SC-2025~SCR
EPC-11-CAO-C-SC-2025
Open
Works - General
30 Months
Unknown (Unspecified Location)
₹0
₹2 Cr
23 Apr 2026
8 Dec 2025
9 Apr 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 7,23,15,18,479.04 | ||
| — | — | — | 7,23,15,18,479.04 | ||
| Central Railway of Track connection with | :- South Contract for Doubling works in | (Construction between Bellamkonda Doubling of | Procurement and including Andhra Pradesh. |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1.NALLAPADUESP.pdf
ATTACHMENT
2.BANDARUPALLIESP.pdf
ATTACHMENT
3.SIRIPURAMESP.pdf
ATTACHMENT
4.PEDAKURAPADUESP_2.pdf
ATTACHMENT
5.SATTENAPALLIESP.pdf
ATTACHMENT
6.REDDIGUDEMESP.pdf
ATTACHMENT
7.BELLAMKONDAESP.pdf
ATTACHMENT
26BondingonBridges.pdf
ATTACHMENT
27WorksiteprotectionFlyleaf-4.pdf
ATTACHMENT
28LargelongtypemastsAECfeederanchor.pdf
ATTACHMENT
29provofadditionalbondingsrtiponportalTTU1.pdf
ATTACHMENT
30standardization_of_boards.pdf
ATTACHMENT
Electricalpolicyletters.pdf
ATTACHMENT
RevisedApprovedlistofBrands30.6.25.pdf
ATTACHMENT
VClink_2.pdf
ATTACHMENT
FacilityChartNLPDBMKD.pdf
ATTACHMENT
ESO73-HeightgaugesatallroadunderbridgesincludingSubw_1.pdf
ATTACHMENT
Brno40AMaj_1.pdf
ATTACHMENT
brno43Maj_1.pdf
ATTACHMENT
Brno44Maj_1.pdf
ATTACHMENT
Brno45Maj_1.pdf
ATTACHMENT
Brno47Maj.pdf
ATTACHMENT
Brno49Maj_1.pdf
ATTACHMENT
Br.No11Maj_1.pdf
ATTACHMENT
RevisedKITNLPDBMKD.pdf
ATTACHMENT
RevisedKITSigned.pdf
ATTACHMENT
RevisedKITon10.03.2026signed.pdf
ATTACHMENT
RevisedKITon18.03.2026..pdf
ATTACHMENT
RevisedKITon01.04.2026.pdf
ATTACHMENT
Br.No24Maj_1.pdf
ATTACHMENT
Br.No14.pdf
ATTACHMENT
TYPICALCABLEDISTRIBUTIONPLANDOUBLELINEFOURROADSTATION_APPROVE_P6_1.pdf
ATTACHMENT
Br.No12NMaj_1.pdf
ATTACHMENT
Brno37_1.pdf
ATTACHMENT
Br.No4NCompletion_1.pdf
ATTACHMENT
Br.No15N_1.pdf
ATTACHMENT
Br.No25Maj_1.pdf
ATTACHMENT
Br.No13_1.pdf
ATTACHMENT
Br.No20_1.pdf
ATTACHMENT
RevisedEPCDocumentsofBMKD-NLPDSigned.pdf
ATTACHMENT
Br.No22_1.pdf
ATTACHMENT
Br.No27_1.pdf
ATTACHMENT
Brno35_2.pdf
ATTACHMENT
Br.No8N_1.pdf
ATTACHMENT
Br.No21_1.pdf
ATTACHMENT
Brno40_1.pdf
ATTACHMENT
Br.No10_1.pdf
ATTACHMENT
NLPD-BMKDTentativeSIPs-7stns_1.pdf
ATTACHMENT
Br.No9N_1.pdf
ATTACHMENT
Br.No11N_1.pdf
ATTACHMENT
Brno32_1.pdf
ATTACHMENT
Br.No6NCompletion_1.pdf
ATTACHMENT
Br.No16N_1.pdf
ATTACHMENT
RevisedRFPDocuemntofNLPDBMKDSigned.pdf
ATTACHMENT
Brno50_1.pdf
ATTACHMENT
Br.No7N_1.pdf
ATTACHMENT
Brno52_1.pdf
ATTACHMENT
Br.No10N_1.pdf
ATTACHMENT
Br.No16_1.pdf
ATTACHMENT
GunturBibinagarKMLfile_1.pdf
ATTACHMENT
Br.No17_1.pdf
ATTACHMENT
Brno31_1.pdf
ATTACHMENT
Brno34_1.pdf
ATTACHMENT
Br.No13N_1.pdf
ATTACHMENT
Br.No15_1.pdf
ATTACHMENT
PolicyLetteronToolkitforSTStaff13.09.2024_1.pdf
ATTACHMENT
PrebidqueriesrepplyofNLPD-BMKDEPC1.pdf
ATTACHMENT
Brno54_2.pdf
ATTACHMENT
Brno38_1.pdf
ATTACHMENT
Brno55.pdf
ATTACHMENT
Br.No28_1.pdf
ATTACHMENT
Br.No30_1.pdf
ATTACHMENT
SampleCalculationSheet..pdf
ATTACHMENT
Brno42_1.pdf
ATTACHMENT
Brno53_1.pdf
ATTACHMENT
SpecialconditionsTechnicalforSupplyofballastver3-21.05.20.pdf
ATTACHMENT
SPECIALCONDITIONSTECHNICALFOREARTHWORKANDCONCRETEWORKS-25.03.21ver6_1.pdf
ATTACHMENT
SpecialConditions-Measurementofworksbycontractor28.08.21-Ver-1.pdf
ATTACHMENT
SPECIALCONDITIONS-TECHNICALforEarthworkandConcreteworks18.08.21ver1.pdf
ATTACHMENT
SplconsTechnicalforBldgsworksPFworksWorkshopsFOB-COPworks.-25.03.21Ver3.pdf
ATTACHMENT
SpecialConditionsTechnicalforPSCslabsCONCRETEDESIGN25.03.21VER5.pdf
ATTACHMENT
SpecialconditionsTechnicalforSupplyofballastver5-25.03.21.pdf
ATTACHMENT
SplconditionsTechnicalforLayingLinkingofRailwaytrack25.03.21ver3.pdf
ATTACHMENT
SplconditionsgeneralandTechnicalforATweldingofrailsVER5-11.08.20.pdf
ATTACHMENT
PublicProcurementPolicy19.07.2024.pdf
ATTACHMENT
TENTATIVELSKM185TO190.pdf
ATTACHMENT
TENTATIVELSKM190TO195.pdf
ATTACHMENT
TENTATIVELSKM195TO200.pdf
ATTACHMENT
TENTATIVELSKM200TO205.pdf
ATTACHMENT
TENTATIVELSKM205TO210.pdf
ATTACHMENT
TENTATIVELSKM210TO215.pdf
ATTACHMENT
TENTATIVELSKM215TO220.pdf
ATTACHMENT
TENTATIVELSKM220TO225.pdf
ATTACHMENT
TENTATIVELSKM225TO230.pdf
ATTACHMENT
TENTATIVELSKM230TO235.pdf
ATTACHMENT
TENTATIVELSKM235TO240.pdf
ATTACHMENT
TENTATIVELSKM240TO242.pdf
ATTACHMENT
SAMPLEGAD1x1.50x1.50mRCCBOX422A.pdf
ATTACHMENT
SAMPLEGAD1x2.0x1.50mRCCBOX426A.pdf
ATTACHMENT
SAMPLEGAD1x2.5x1.50mRCCBOX408.pdf
ATTACHMENT
SAMPLEGAD1x3.05x3.20mRCCBOX428.pdf
ATTACHMENT
SAMPLEGAD1x3.66mPSCSLAB433A.pdf
ATTACHMENT
SAMPLEGAD1x4.0x1.50mRCCBOX468.pdf
ATTACHMENT
SAMPLEGAD1X4.0X2.0mRCCBOX452A.pdf
ATTACHMENT
SAMPLEGAD1x5.0x1.80mRCCBOX488.pdf
ATTACHMENT
3x12.20mPSCSLAB453.pdf
ATTACHMENT
4x6.10mPSCSLAB429.pdf
ATTACHMENT
4x12.20mPSCSLAB434.pdf
ATTACHMENT
5x9.15mPSCSLAB413A.pdf
ATTACHMENT
8x12.20mPSCSLAB431.pdf
ATTACHMENT
LC17RUB17A17BGNT-NDKD.pdf
ATTACHMENT
LC19M-21ADoublevent_V9_APPROVE_P55.pdf
ATTACHMENT
LC37RUB41B.pdf
ATTACHMENT
LC41RUB45AGNT-NDKD.pdf
ATTACHMENT
LC45RUB47B.pdf
ATTACHMENT
LC46M-48CDoublevents_V5_APPROVE_P54.pdf
ATTACHMENT
LC49RUB49A.pdf
ATTACHMENT
LC50RUB49C49DGNT-NDKD.pdf
ATTACHMENT
KUKKADAMRBGBLDG.pdf
ATTACHMENT
Gatelodgewithbatteryroom.pdf
ATTACHMENT
Gatelodgewithoutbatteryroom.pdf
ATTACHMENT
BRNO11-SOILREPORT.pdf
ATTACHMENT
BRNO18-SOILREPORT.pdf
ATTACHMENT
BRNO26-SOILREPORT.pdf
ATTACHMENT
BRNO47-SOILREPORT.pdf
ATTACHMENT
BRNO48-SOILREPORT.pdf
ATTACHMENT
BMKD-NLPDAlignmentplan.pdf
ATTACHMENT
FOB-3LINECROSSING-SAMPLEGAD.pdf
ATTACHMENT
FOB-4LINECROSSING-SAMPLEGAD.pdf
ATTACHMENT
10402.pdf
ATTACHMENT
RDSO-B-10402.1.pdf
ATTACHMENT
10402.2.pdf
ATTACHMENT
10402.3.pdf
ATTACHMENT
10402.4.pdf
ATTACHMENT
10402.5.pdf
ATTACHMENT
10402.6.pdf
ATTACHMENT
10402.7.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405-1.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405-2.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405-3.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405-4.pdf
ATTACHMENT
FOB3mWIDE4TRACKRDSO-B-10405-5.pdf
ATTACHMENT
RDSORA-10503.pdf
ATTACHMENT
RDSORA-10513.pdf
ATTACHMENT
RDSORA-10514.pdf
ATTACHMENT
RDSORA-10517.pdf
ATTACHMENT
RDSORA-10519.pdf
ATTACHMENT
RDSORA-10520.pdf
ATTACHMENT
RDSORA-10521.pdf
ATTACHMENT
RDSOPFSHELTER10518.pdf
ATTACHMENT
6.10mPSCslab-10257.pdf
ATTACHMENT
RDSOdrgfor12.20mPSCslab-10271.pdf
ATTACHMENT
10256.pdf
ATTACHMENT
10256.1.pdf
ATTACHMENT
10256.2.pdf
ATTACHMENT
10256.3.pdf
ATTACHMENT
10273.pdf
ATTACHMENT
10273-1.pdf
ATTACHMENT
10273-2.pdf
ATTACHMENT
10273-3.pdf
ATTACHMENT
10273-4.pdf
ATTACHMENT
BallastprofileforLWRtrack.pdf
ATTACHMENT
BUFFERENDDRG.pdf
ATTACHMENT
CrossSlopeforNewtrackfordoublings.pdf
ATTACHMENT
HeightGuage.pdf
ATTACHMENT
PassengerPFwithVDCAlt-1to71_2022.pdf
ATTACHMENT
PFBoundaryWall.pdf
ATTACHMENT
PFwalldrg70-2022.pdf
ATTACHMENT
SC-RetainingWall-CHZ-355-2021.pdf
ATTACHMENT
Specificationsofballast.pdf
ATTACHMENT
SpecimendrawingforDrain.pdf
ATTACHMENT
SpecimendrawingforTrolleyrefugee.pdf
ATTACHMENT
SPECIMENDRGFORPLATFORMAMENITIES.pdf
ATTACHMENT
TentativeApproachRoadSketch.pdf
ATTACHMENT
TentativesketchforCirculatingArea.pdf
ATTACHMENT
TentativesketchforTrolleyPathway.pdf
ATTACHMENT
TMSidinglayout.pdf
ATTACHMENT
BRNO12N-SOILREPORT.pdf
ATTACHMENT
BRNO25-SOILREPORT.pdf
ATTACHMENT
BRNO40A-SOILREPORT.pdf
ATTACHMENT
BRNO45-SOILREPORT.pdf
ATTACHMENT
BRNO43-SOILREPORT.pdf
ATTACHMENT
2RDSOOHEPSIReportsandemp.sch.pdf
ATTACHMENT
3BafflewallandprotectivescreenRDSOdrgs.pdf
ATTACHMENT
4BondingandeartingSpec.1990.pdf
ATTACHMENT
5ElectricalTRDdrawingslinks.pdf
ATTACHMENT
6ETISPCPSICLS0020.pdf
ATTACHMENT
7ProtectivescreenMODI.pdf
ATTACHMENT
8Retro-reflectivenumberplateonONEmast07.05.2012.pdf
ATTACHMENT
9HeightgaugesStd.ISMBtype.pdf
ATTACHMENT
10SCADATI_SPC_RCC_SCADA_0134-pages-11.pdf
ATTACHMENT
11TICIVMS2020dt22.08.2022galvanization.pdf
ATTACHMENT
12Master_list_of_drawings_TI2023.pdf
ATTACHMENT
13ATCLSjunctionboxdrgs.pdf
ATTACHMENT
14OHEdepotPSIdepotElectmaindepotandcontractorstoredepotdrgs.pdf
ATTACHMENT
15TOWERCARANDOHECUMPSIdepotdrg.pdf
ATTACHMENT
16All2x25TSSSPSSPRDSOdrawings.pdf
ATTACHMENT
17ImportantElectricalTRDguidelinesletters.pdf
ATTACHMENT
18preinspectionletters.pdf
ATTACHMENT
19GEworksCircular04-2022_monitoringGEWorks.pdf
ATTACHMENT
21GuaranteeCertificateformaterevisedALLEPCContractors.pdf
ATTACHMENT
22SixPillarsofConstDeptppt.pdf
ATTACHMENT
ExistingtentativeKM_6-24_LOP.pdf
ATTACHMENT
ExistingtentativeKM_24-39_LOP.pdf
ATTACHMENT
ExistingtentativeKM_39-65_LOP.pdf
ATTACHMENT
24Spacingofpedestalinsulators-Policy1.pdf
ATTACHMENT
25CableTrenchdrgforSSPSPin2x25kvsystem.pdf
ATTACHMENT
Brno44Maj_1.pdf
CORRIGENDUM
RevisedKITon01.04.2026.pdf
CORRIGENDUM
RevisedKITon18.03.2026..pdf
CORRIGENDUM
RevisedKITon10.03.2026signed.pdf
CORRIGENDUM
RevisedKITSigned.pdf
CORRIGENDUM
RevisedKITNLPDBMKD.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .