Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.6 LAccepted-AOC TUTICORIN TAMIL NADU | L1 | Accepted-AOC accepted negotiation | |
| 2 | L2₹1.0 Cr+₹8.4 L (9.08%)Rejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | L2 | Rejected-AOC refused |
| Sl No | Description | Qty | Unit | S YOGARAJ CONTRACTOR L1 | THIAGARAJAN ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | air cleaning and water washing the boiler tube puncture area to facilitate boiler tube rectification works. | 10 | Time | 14,429 ₹1,44,290 Lowest | 15,740 ₹1,57,400 |
| 2.00 | Assistance and inspection for Boiler Hydraulic test when the unit is in standby condition.
This work comprises of assistance for hydraulic test and inspection of Boiler at pressurized condition in boiler I st pass, Inter pass, II nd pass and Economiser hopper area and allied valve operations etc., | 10 | Time | 17,757 ₹1,77,570 Lowest | 19,372 ₹1,93,720 |
| 3.00 | transportation, Assembling and dismantling of Temporary maintenance platform / Sky climer for shut down maintenance works.
Transportation of 1set of Temporary maintenance platform/ Sky climber along with ropes, hoist, power cable etc. from pocket store. | 10 | nos | 2,877 ₹28,770 Lowest | 3,138 ₹31,380 |
| 4.00 | Opening/Closing of manhole doors, leading & lifting of platform to 9 mtr & transporting of ropes to 83 mtrs and providing temporary platform in 9 mtr level assembling of Sky climber inside the boiler. | 10 | nos | 11,215 ₹1,12,150 Lowest | 12,234 ₹1,22,340 |
| 5.00 | Assembling / dismantling of Sky climber and removal of Temporary Maintenance platform / For one No. in 9 mtr inside the boiler: | 10 | nos | 23,958 ₹2,39,580 Lowest | 26,136 ₹2,61,360 |
| 6.00 | shifting the sky climber inside the furnace for access of LHS/RHS side | 10 | nos | 11,812 ₹1,18,120 Lowest | 12,886 ₹1,28,860 |
| 7.00 | operation of sky climber as per the requirements to assist various overhauling works such as Boiler cleaning, tube thickness survey etc., during the maintenance work period. | 170 | nos | 2,527 ₹4,29,590 Lowest | 2,756 ₹4,68,520 |
| 8.00 | renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 480 | nos | 6,210 ₹29,80,800 Lowest | 6,774 ₹32,51,520 |
| 9.00 | Charges IBR welder for Arc filling of area 25 x 150 M2 by 3 layer. | 240 | joints | 792 ₹1,90,080 Lowest | 864 ₹2,07,360 |
| 10.00 | Arc fillingi) Grinding of boiler tubes for arc fillling size 150X 25M2 area for 3 layers. | 120 | nos | 2,980 ₹3,57,600 Lowest | 3,251 ₹3,90,120 |
Tender Value
Refer Docs
EMD Value
₹79,000
Closing Date
27 Mar 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II M I Circle BM Division 600 MW Unit II Boiler Attending Boiler tube
2025_EB_534466_1
CE NCTPS II SE M I O M 280 2024 25
Open Tender
Miscellaneous Works
Item Rate
365 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹79,000
Yes
1 Oct 2026
21 Mar 2025
28 Mar 2025
21 Mar 2025
27 Mar 2025
21 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .