| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LAccepted-AOC AIR FORCE ROAD GORAIMARI PO HALESWAR PS TEZPUR DISTT SONITPUR ASSAM 784104 | SONITPUR | ASSAM | 784104 | L1 | Accepted-AOC Awarded. | |
| 2 | L1₹82.1 LRejected-Finance JAIL ROAD K A ROAD NAGAON ASSAM | NAGAON | NAGAON | ASSAM | L1 | Rejected-Finance Refer Financial Minutes | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Admitted. Refer Technical minutes | |
| 4 | Rejected-Technical KAMALPUR P O BAIHATA P S KAMALPUR DIST KAMRUP | KAMRUP | ASSAM | 781030 | - | Rejected-Technical Not Admitted. Refer Technical minutes | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Admitted. Refer Technical minutes |
Tender Value
₹86.4 L
EMD Value
₹1.7 L
Closing Date
22 Feb 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
O/o Director of Soil Conservation
Borthal Borali Water Harvesting cum Water Distribution Project under RIDFXXVIII for 2022-23
2024_SCD_36216_3
Tender/NIT/Pt/2023-24/9307
Open Tender
Civil Works
Item Rate
90 days
Hamren
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,730
₹1.7 L
Yes
23 Aug 2024
13 Feb 2024
23 Feb 2024
14 Feb 2024
22 Feb 2024
15 Feb 2024
Amount
Part - A : Brick Canal
Excavation for Structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying Brick Soling layer on prepared sub- grade with brick on end edging according to lines, graded and cross- section shown on the drawing filling joints with sand earth and as per the technical specification.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Misc. expenditure ( Signboard, photography etc.)
Part - B : Brick Canal
Excavation for structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying Brick Soling layer on prepared sub- grade with brick on end edging according to lines, graded and cross- section shown on the drawing filling joints with sand and earth and as per the technical specification.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Misc. expenditure
Part - C : Brick Canal
Excavation for Structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Misc. expenditure
Part - D : Brick Canal
Excavation for Structures ( earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204.
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Misc. expenditure ( Signboard, photography etc.)
Part - E: Water Harvesting Stucture
Earthwork in filling in the guide bund by head load to divert the flow of water as per specification.
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical Specification Clause 302.3 (Manual method should be adopted where machines can not be deployed due to site condition)
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per table 1300.1, no fragment weighing less than 25Kg laid dry complete as per drawing and technical specification Clause 1301.
Construction of diversion channel to flow the water of the proposed site
Earthwork filling for closing the diversion channel after completion of work
Construction of approach road for carriage of construction material etc. LS
Cost of Tube Well including installation LS
Part - F : Water Distribution Canal
Clearing and grubbing road land including uprooting wild vegetation, grass etc. as per direction.
Excavation in cutting in soil by manual means with lead upto 50.00mm and as per technical specification.
Laying Brick Soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth and as per the technical specification.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/ Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork.
supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plastering with cement mortar (1:3) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Providing & laying RCC sign board with engrave lettering.
Construction of Temporary Camp Hut for Store the materials etc.
Miscellaneous Expenditure (Local carriage of Material etc.)
M/S R.B. Construction
stage.html
html • 0.05 MB
techsummary_59253.pdf
PDF • 1.62 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_59253.pdf
PDF • 1.79 MB
Borthol_Borali_FWO.pdf
PDF • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .