Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹19,000
Closing Date
21 Jul 2026, 5:30 pm
SE, RRCD No.V, Athagarh
Rengali Right Canal Division No.V,Athagarh, At - Khuntakata, Pin - 754029
Excavation of canal including CC lining and construction of service road and construction of guard wall
2026_CEBMD_134616_1
SERRCD-V-02/2026-27
Open Tender
Civil Works - Canal
Athagarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹19,000
Yes
7 Jul 2026
7 Jul 2026
22 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
7 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in canal/ foundation of structures by manual/ mechanical means in all kinds of soil (This shall include ordinary soil, hard soil, gravelly soil, slushy soil, stoney earth mixed with gravels, pebbles, stoneboulders not exceeding 0.5 cum by volume, stiff heavy clay, hard shale, compacted moorum soling of road path, sand silt etc.) in both wet and dry condition, shoring, shuttering, propping bullahs, piling, dewatering wherever necessary, providing coffer dam, diverting the water away from working areas, dressing, levelling the canal bed and sides as per drawing and specifications and removing the excavated materials with all leads, lifts and delifts etc. and depositing the same in layers not exceeding 22.50cm (9") in depth in the embankment sections under OMC condition to receive compaction after breaking clods to maximum 5cm to 7cm size and depositing the excess/un-usable materials in spoil banks or any other specified space by mechanical/manual means with all leads, lifts and delifts complete with all costs for site illumination, mobilisation, demobilisation, approach road, diversion road, coffer dam and royalty, cess, T&P. etc. complete including all costs incidental to the work as per specification and direction of the Engineer-in-Charge. (Payment will be made on finished level section) | 2,273.31 | Cum | 81.9 | ₹1,86,184.09 |
| 2 | Excavation in canal/ foundation of structures by manual/ mechanical means in D.I. rock, fractured rock, soft rock, laterite rock,sand stone and lime stone etc. not requiring blasting interspread with boulders up to 0.5 cum in volume in both wet and dry condition including all accessories, machine charges etc. and depositing the excavated materials either in spoil banks or in specified space by mechanical/mannual means with all leads, lifts and delifts etc. shoring, shuttering, propping bullahs, piling, dewatering wherever necessary with all cost and running charges of pumps and accessories, providing coffer dam including diverting the water away from the work site and dressing & levelling the canal bed and sides complete with all costs for site illumination, mobilisation, demobilisation, approach road, diversion road, coffer dam and royalty, cess, T & P etc. complete with all costs incidental to the work as per specification and direction of the Engineer-in-Charge. (Payment will be made on finished level section ) | 320.43 | Cum | 104.8 | ₹33,581.06 |
| 3 | Supplying & spreading CNS layer of sand & moorum admixture (1:2) on finished surface on slopes & bed of canal as filter material including labour charges for admixing including cost, carriage, royalty,EMF,DMF,Additional Charges of materials with T & P, labour, cess etc. including watering and compaction by suitable means to receive concrete lining complete as per direction of Engineer-in-Charge. | 98.15 | Cum | 1,402 | ₹1,37,606.3 |
| 4 | Supplying and spreading sand of approved specification in filter drains in bed and slope of canal including cost, conveyance, royalty,EMF,DMF,Additional Charges of materials, labour, cess, T&P etc. complete as per the direction of the Engineer-in-Charge. | 34.54 | Cum | 968.9 | ₹33,465.81 |
| 5 | Supplying and spreading gravel in filter drains in bed and slope of canal including cost, conveyance, royalty ,EMF,DMF,Additional Charges of materials, labour, cess, T&P etc. complete as per the direction of the Engineer-in-Charge. | 34.54 | Cum | 758.8 | ₹26,208.95 |
| 6 | Collecting,supplying and spreading 20mm to 40mm down graded crushed granite chips or broken rock filled up to invert of pipe in longitudinal drain/for filter drain including cost, conveyance, royalty ,EMF,DMF,Additional Charges of materials, labour, cess, T&P etc. complete as per the direction of the Engineer-in-Charge. | 14.68 | Cum | 3,059.3 | ₹44,910.52 |
| 7 | Collecting, supplying and spreading 5mm to 20mm down graded crushed granite chips or broken rock filled for filter drain including cost, conveyance, royalty,EMF,DMF,Additional Charges of materials, labour, cess, T&P etc. complete as per the direction of the Engineer-in-Charge. | 16.17 | Cum | 3,268.1 | ₹52,845.18 |
| 8 | Providing and laying Cement Concrete of grade M-15 in approved surface using 20mm size & down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification for concrete linning to the bed and slope of the canal with sleeper beams, keys etc. in pannels including trimming and dressing of canal bed slopes including cutting trenches to the sleeper beams, keys & drain etc. mixing in concrete mixure/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, conveyance, royalty ,EMF,DMF,Additional Charges of materials, labour, cess etc. complete including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including cost of shuttering,providing polythene film of 100 micron mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire & running charges of machineries required for the work, approach road, diversion road & site illumination etc. as per approved drawings and specification complete with all costs incidental to the work and as directed by the Engineer-in-Charge. | 27.35 | Cum | 6,452 | ₹1,76,462.2 |
| 9 | Providing and laying Cement Concrete of grade M-15 in approved surface using 20mm size & down graded hard granite well graded crusher broken stone aggregate, sharp sand and cement of approved grading and quality confirming to the specification for concrete linning with paver finish to the bed and slope of the canal with sleeper beams, keys etc. in pannels including trimming and dressing of canal bed slopes including cutting trenches to the sleeper beams, keys & drain etc. mixing in concrete mixure/batching and mixing plant with all leads, lifts, delifts and transportation by mechanical/manual means including cost, conveyance, royalty,EMF,DMF,Additional Charges of materials, labour, cess etc. including dewatering by suitable means with all costs, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including Cost of shuttering, providing polythene film of 100 microns mobilisation and demobilisation with cost of construction and dismantling of gangways and scaffolding, chute, coffer dam with all materials, hire & running charges of machineries required for the work, approach road, diversion road & site illumination etc. as per approved drawings and specification complete with all costs incidental to the work and as directed by the Engineer-in-Charge. | 46.53 | Cum | 6,596.6 | ₹3,06,939.8 |
| 10 | Supplying, providing and placing 100mm dia nominal diamater class-II, 4 kgf/Sqcm pressure having 2.151kg weight per running meter perforated PVC pipes in horizontal filter drains including cost, conveyance, royalty etc. of all materials, labour, cess, T&P and all other cost incidental to the work as per specification and direction of the Engineer-in-Charge. | 137 | Rmt | 238.2 | ₹32,633.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
finalBidBalancework.pdf
Tender Documents • 2.74 MB
BOQ_599945.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid