| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹14.2 L+₹87,030.40 (6.54%)Admitted-Finance 12 14 FIRST FLOOR KUMARESAPURAM STREET 3 TIRUCHENGODE 637 211 | TIRUCHENGODE | NAMAKKAL | TAMIL NADU | 637211 | L2 | Admitted-Finance | |
| 3 | L3₹14.4 L+₹1.1 L (8.51%)Admitted-Finance DOOR NO 210 KARAIYAVUR A ATTUKARANUR PO OMALUR TK SALEM TAMIL NADU 636304 | SALEM | TAMIL NADU | 636304 | L3 | Admitted-Finance | |
| 4 | L4₹14.5 L+₹1.2 L (8.80%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹15.0 L+₹1.7 L (12.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S RATHIKA CONSTRUCTIONS L12 | Kuppusamy and Co L3 | M/s.Vetri constructions L10 | SURIYA ENGINEERING CONTRACTORS L5 | SAMY CONSTRUCTION L11 | M.SARAVANAN CONTRACTOR L4 | CMR ENGINEERING WORKS L1 | MOHIDEEN ENTERPRISES L8 | DIVIN ENGINEERING L6 | M. Kumar Contractor L7 | srimookambikaandco L2 | Rudhran Enterprises L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges, lead lift, etc., complete. | 152 | Sqm | 4.4 ₹668.8 | 7 ₹1,064 | 6 ₹912 | 5.46 ₹829.92 | 5.5 ₹836 | 5 ₹760 | 3 ₹456 Lowest | 6 ₹912 | 5.5 ₹836 | 20 ₹3,040 | 5.2 ₹790.4 | 9 ₹1,368 |
| 2.00 | Earth work excavation and depositing it away from site with initial lead of 10m & initial lift of 2m in Hard stiff clay, stiff back cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders | 175 | Cum | 100 ₹17,500 | 98 ₹17,150 | 100 ₹17,500 | 112 ₹19,600 | 120 ₹21,000 | 109 ₹19,075 | 99 ₹17,325 | 140 ₹24,500 | 120 ₹21,000 | 50 ₹8,750 Lowest | 134 ₹23,450 | 111 ₹19,425 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadam 150 mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sub / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of materials labour charges rentals for machinery fuel and all other incidental charges etc. complete as per clause 406 of Morth Rev.5. | 175 | Cum | 2,030 ₹3,55,250 | 1,800 ₹3,15,000 | 2,000 ₹3,50,000 | 2,013 ₹3,52,275 | 2,120 ₹3,71,000 | 1,943 ₹3,40,025 | 1,700 ₹2,97,500 Lowest | 2,300 ₹4,02,500 | 2,000 ₹3,50,000 | 2,200 ₹3,85,000 | 2,138 ₹3,74,150 | 2,200 ₹3,85,000 |
| 4.00 | Shuttering and strutting for sides of concrete pavement including cost of all materials lead, lift, labour charges, etc., complete. | 33 | Sqm | 350 ₹11,550 | 350 ₹11,550 | 400 ₹13,200 | 393 ₹12,969 | 400 ₹13,200 | 380 ₹12,540 | 400 ₹13,200 | 600 ₹19,800 | 400 ₹13,200 | 170 ₹5,610 Lowest | 542 ₹17,886 | 345 ₹11,385 |
| 5.00 | Providing P.C.C 1:1.5:3 using 20mm metal including cost of all materials, leads lifts, labour charges etc, complete | 175 | Cum | 8,000 ₹14,00,000 | 6,240 ₹10,92,000 | 6,800 ₹11,90,000 | 6,327 ₹11,07,225 | 7,000 ₹12,25,000 | 6,106 ₹10,68,550 | 5,700 ₹9,97,500 Lowest | 6,250 ₹10,93,750 | 6,500 ₹11,37,500 | 6,500 ₹11,37,500 | 5,705 ₹9,98,375 | 6,500 ₹11,37,500 |
| 6.00 | Provision of bitumen pad 20mm thick @ 10m interval along road for expansion joint including cost of all materials, leads lifts, labour charges etc., | 8 | Sqm | 350 ₹2,800 | 900 ₹7,200 | 750 ₹6,000 | 902 ₹7,216 | 1,000 ₹8,000 | 870 ₹6,960 | 600 ₹4,800 | 540 ₹4,320 | 950 ₹7,600 | 100 ₹800 Lowest | 395 ₹3,160 | 450 ₹3,600 |
Tender Value
Refer Docs
EMD Value
₹20,600
Closing Date
20 Jul 2026, 2:00 pmClosed
SE/EGC
Uratchikottai, K.N.Palayam Post, Bhavani, Erode Dt
Repair works to the pavement over embankment by providing PCC road toping on the left flank of Barrage Power House-I/ Chekkanur
2026_EB_683672_1
SE/EGC/Civil/No. 06/2026-27
Open Tender
Civil Works
Works
90 days
Chekkanur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,600
Yes
17 Oct 2026
2 Jul 2026
21 Jul 2026
2 Jul 2026
20 Jul 2026
2 Jul 2026
2 Jul 2026 - 20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Scrub jungle including all labour charges, lead lift, etc., complete. | 152 | Sqm | - | - |
| 2 | Earth work excavation and depositing it away from site with initial lead of 10m & initial lift of 2m in Hard stiff clay, stiff back cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders | 175 | Cum | - | - |
| 3 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadam 150 mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sub / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of materials labour charges rentals for machinery fuel and all other incidental charges etc. complete as per clause 406 of Morth Rev.5. | 175 | Cum | - | - |
| 4 | Shuttering and strutting for sides of concrete pavement including cost of all materials lead, lift, labour charges, etc., complete. | 33 | Sqm | - | - |
| 5 | Providing P.C.C 1:1.5:3 using 20mm metal including cost of all materials, leads lifts, labour charges etc, complete | 175 | Cum | - | - |
| 6 | Provision of bitumen pad 20mm thick @ 10m interval along road for expansion joint including cost of all materials, leads lifts, labour charges etc., | 8 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_821800.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .