Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.7 L+₹26,265.57 (7.64%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.9 L+₹47,134.92 (13.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.0 L+₹53,594.48 (15.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.0 L+₹61,047.82 (17.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹14,910
Closing Date
30 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O SEGREGATION SHED AT HP TAWEELA
2026_RDPR_329265_73
ENIT129of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹14,910
4 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
30 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | earthwork in excavation by mechanical means(not exceeding 1.5m in width and 10sqm on plan) inc levelling of sides and ramming of bottoms lift upto 1.5m and lead upto 1.5m all kinds of soils | 8.43 | cum | 256.85 | ₹2,165.25 |
| 2 | providing and laying of dry stome solling i/c ramming dressing etc complete job | 9.58 | cum | 1,229.35 | ₹11,777.17 |
| 3 | p/l of cement concrete flooring 1:2:4 cj | 23.21 | sqm | 562.15 | ₹13,047.5 |
| 4 | providing and laying in position cement concrete (1:4:8 graded stone aggregate 40 mm nominal size mix of specified grade exc. Cost of centering and shuttering all work upto plinth level. | 4.01 | cum | 5,562.77 | ₹22,306.71 |
| 5 | providing and laying in position cement concrete (1:3:6 graded stone aggregate 20 mm nominal size mix of specified grade exc. Cost of centering and shuttering all work upto plinth level.inc carriage of materials | 8.73 | cum | 6,114 | ₹53,375.22 |
| 6 | cenetering and shuttering inc. propping etc and removal of same inc. all carriages. | 20.91 | sqm | 286.35 | ₹5,987.58 |
| 7 | brickwork with fps bricks of class designation 75 in foundation and plinth in CM (1:6) inc. all carriages complete job. Inc extra for every floor level upto v | 6.14 | cum | 9,027.2 | ₹55,427.01 |
| 8 | p/f g.i chain link fabric fencing of required width in mesh size 50x50 mm inc strenthening with 2mm dia wire or nuts bolts and washers as required cj as per direction of engineer incharge gi wire of 2mm dia | 26.02 | sqm | 516.48 | ₹13,438.81 |
| 9 | p/a 12mm thick cement plaster in 1:6 inc. all carriages CJ. | 59.56 | sqm | 266.2 | ₹15,854.87 |
| 10 | finishing walls with water proofing cement paint of required shade on new work 2 or more coats cj | 59.56 | sqm | 98.75 | ₹5,881.55 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1115951.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .