Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,946Accepted-AOC AT BHULI B BLOCK BHULI SUB POST OFFICE BHULI ROAD NEAR SHIV MANDIR BHULI PO BHULI DHANBAD 828104 | DHANBAD | DHANBAD | JHARKHAND | 828104 | L1 | Accepted-AOC RECOMMENDED BY TC |
| Sl No | Description | Qty | Unit | Vishwakarma Enterprises L1 |
|---|---|---|---|---|
| 0.00Scope of work for each job is mentioned as below: 1. INSTALLATION OF PUMP & MOTOR ASSEMBLY • Preparation of base for pump & motor assembly. • Preparation of piping arrangement. • Installation of pump & motor assembly. • Connections with pump & motor assembly. 2. MAKING ARRANGEMENT FOR FORCED SPRIKLING, FIREFIGHTING & PRIMING • Preparation of base for water monitor. • Preparation of piping arrangement for all functions, i.e., forced sprinkling, firefighting & priming. • Installation of monitor. • Connections monitor. | ||||
| 1.01 | Total Labour charge with contractor’s profit (Exclusive of GST) for complete job as per SCOPE OF WORK & NIT | 2 | job | 38,950 ₹77,900 Lowest |
| 1.02 | Total charge (Exclusive of GST) for Hiring of Welding machine with accessories for complete job as per SCOPE OF WORK & NIT | 2 | job | 2,400 ₹4,800 Lowest |
| 1.03 | Total charge (Exclusive of GST) for Hiring of Tools & Tackles for complete job as per SCOPE OF WORK & NIT | 2 | job | 1,000 ₹2,000 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
Refer Docs
EMD Value
₹1,900
Closing Date
10 Nov 2025, 11:00 amClosed
GM (Excavation), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work towards Installation of Pump and Motor Assy with forced sprinkling and water monitor arrangements in 02 nos converted water tankers of Dudhichua Project
2025_NCL_346453_1
DCH/GM (Excv)/Tender/85Te /2025-26/62
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, Dudhichua Project
Please refer Tender documents
4 documents required · 4 mandatory
₹1,900
17 Dec 2025
30 Oct 2025
11 Nov 2025
30 Oct 2025
10 Nov 2025
31 Oct 2025
30 Oct 2025 - 7 Nov 2025
Amount
Scope of work for each job is mentioned as below: 1. INSTALLATION OF PUMP & MOTOR ASSEMBLY • Preparation of base for pump & motor assembly. • Preparation of piping arrangement. • Installation of pump & motor assembly. • Connections with pump & motor assembly. 2. MAKING ARRANGEMENT FOR FORCED SPRIKLING, FIREFIGHTING & PRIMING • Preparation of base for water monitor. • Preparation of piping arrangement for all functions, i.e., forced sprinkling, firefighting & priming. • Installation of monitor. • Connections monitor.
Total Labour charge with contractor’s profit (Exclusive of GST) for complete job as per SCOPE OF WORK & NIT
Total charge (Exclusive of GST) for Hiring of Welding machine with accessories for complete job as per SCOPE OF WORK & NIT
Total charge (Exclusive of GST) for Hiring of Tools & Tackles for complete job as per SCOPE OF WORK & NIT
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_359135.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.61 MB
ANNEXURES.pdf
Tender Documents • 0.29 MB
ITB_COC_ATC.pdf
Tender Documents • 0.63 MB
BOQ_359135.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .