Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10,200
Closing Date
9 Jul 2026, 2:30 pm
Similar tender results from the same govt authority in the past 3 years.
Comprehensive Annual Maintenance Contract of Ductable Air-conditioning Package unit (Make: Hitachi) of capacity 8.5 TR- 2 nos at MBB Relay Room for Three (03) Years.
ELEG-OT-1338-2026-27
ELEG-OT-1338-2026-27
Open
36 Months
Unknown (Unspecified Location)
₹0
₹10,200
18 Jun 2026
18 Jun 2026
25 Jun 2026
I-Non Schedule (CAMC Work)
Comprehensive annual maintenance contract of Ductable Air-conditioning Package unit of capacity 8.5 TR- 2 1 nos(Make- Hitachi) alongwith air handling unit(AHU)-2 nos,electrical control unit with timer-2nos and 3Ph DOL starter-2nos( repair/replacement of any parts as and when required) complete with all accessories for 1st year at MBB Relay Room. (1job=Maintenance work of 21.25 HP unit per month)
Comprehensive annual maintenance contract of Ductable Air-conditioning Package unit of capacity 8.5 TR- 2 2 nos(Make- Hitachi) alongwith air handling unit(AHU)-2 nos,electrical control unit with timer-2nos and 3Ph DOL starter-2nos( repair/replacement of any parts as and when required) complete with all accessories for 2nd year at MBB Relay Room. (1job=Maintenance work of 21.25 HP unit per month)
Comprehensive annual maintenance contract of Ductable Air-conditioning Package unit of capacity 8.5 TR- 2 3 nos(Make- Hitachi) alongwith air handling unit(AHU)-2 nos,electrical control unit with timer-2nos and 3Ph DOL starter-2nos( repair/replacement of any parts as and when required) complete with all accessories for 3rd year at MBB Relay Room. (1job=Maintenance work of 21.25 HP unit per month)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Advance
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf Correction
ATTACHMENT
OpenETenderDocument.pdf
ATTACHMENT
LTHTElectricalBooklet.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_20221.pdf
ATTACHMENT
FormatofGuaranteeBond.pdf
ATTACHMENT
GCC-April-2022.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf
ATTACHMENT
Download all tender documents and submit your bid