| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹15.2 L (9.99%)Admitted-Finance | ₹1.7 Cr+₹15.2 L (9.99%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹17.8 L (11.7%)Admitted-Finance | ₹1.7 Cr+₹17.8 L (11.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 7 JASWANT NIWAS NAGBANI MACHHLIAN NAGBANI NAGABANI JAMMU JAMMU KASHMIR 181206 | JAMMU | JAMMU AND KASHMIR | 181206 | - | - | Rejected-Technical NON RESPONSIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | Chenab Infrastructure Pvt. Ltd. L1 | SAI CONSTRUCTIONS L2 | M/S PARDEEP KOHLI L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Deep Drilling and Development of 250 mm dia production Tube well (02 Nos) of depth upto 250 Metres BGL by using any suitable drilling method (Reverse/Direct/Dual) at different locations of (i) WSS Chack Rijju (ii) WSS Chack Ram Chand in District Kathua under JJM. | ||||||
| 1.01 | Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site (for the locations of each Tube well of 02 nos.Tubewells mentioned above.) | 2 | Job | 85,000 ₹1,70,000 Lowest | 95,000 ₹1,90,000 | 1,00,000 ₹2,00,000 |
| 1.02 | Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job , all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL (200 Mtrs. each for 02 nos.Tubewells mentioned above.) | 400 | Mtr | 19,600 ₹78,40,000 Lowest | 21,850 ₹87,40,000 | 22,000 ₹88,00,000 |
| 1.03 | ii) From 200 to 250 mtrs BGL (50 mtr each for 02 Nos tubewells mentioned above) | 100 | Mtr | 22,900 ₹22,90,000 Lowest | 24,700 ₹24,70,000 | 25,000 ₹25,00,000 |
| 1.04 | Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency. (220 mtrs each for 02 Nos tube wells mentioned above ) | 440 | Mtr | 6,000 ₹26,40,000 Lowest | 6,390 ₹28,11,600 | 6,500 ₹28,60,000 |
| 1.05 | Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of the tubewell , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency. (30 mtrs each for 02 Nos Tubewells mentioned above ) | 60 | Mtr | 9,275 ₹5,56,500 Lowest | 9,900 ₹5,94,000 | 11,000 ₹6,60,000 |
| 1.06 | Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge. (60 Cum each for 02 nos.Tubewells mentioned above ) | 120 | Cum | 4,500 ₹5,40,000 Lowest | 4,900 ₹5,88,000 | 5,000 ₹6,00,000 |
| 1.07 | Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge. ( each for 02 nos.Tubewells mentioned above.) | 2 | Job | 6,02,000 ₹12,04,000 Lowest | 6,85,000 ₹13,70,000 | 7,00,000 ₹14,00,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 Aug 2023, 6:00 pmClosed
office chamber of the Chief Engineer, Jal Shakti (
office chamber of the Chief Engineer, Jal Shakti (PHE) Department
Construction of 250 mm Dia. Production Tube Wells by any suitable method (reverse/direct/dual rotary) using Mud-Rotary Drilling Rig for 08 Water Supply Schemes (08 nos. Tube wells) of District Kathua of JAMMU Province under Jal Jeevan Mission
2023_PHE_225959_4
PHEJ/JJM/89 of 2023-24
Open Tender
Drilling Works
Item Rate
100 days
As per BOQ
As per tender Documents
7 documents required · 7 mandatory
₹1,000
Yes
Chief Accounts Officer (CAO), Jal Shakti PHE Depar
₹1 L
office chamber of the Chief Engineer, Jal Shakti (
18 Sept 2023
11 Aug 2023
19 Aug 2023
11 Aug 2023
18 Aug 2023
12 Aug 2023
12 Aug 2023
Amount
Construction of Deep Drilling and Development of 250 mm dia production Tube well (02 Nos) of depth upto 250 Metres BGL by using any suitable drilling method (Reverse/Direct/Dual) at different locations of (i) WSS Chack Rijju (ii) WSS Chack Ram Chand in District Kathua under JJM.
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site (for the locations of each Tube well of 02 nos.Tubewells mentioned above.)
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job , all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL (200 Mtrs. each for 02 nos.Tubewells mentioned above.)
ii) From 200 to 250 mtrs BGL (50 mtr each for 02 Nos tubewells mentioned above)
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency. (220 mtrs each for 02 Nos tube wells mentioned above )
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of the tubewell , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency. (30 mtrs each for 02 Nos Tubewells mentioned above )
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge. (60 Cum each for 02 nos.Tubewells mentioned above )
Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge. ( each for 02 nos.Tubewells mentioned above.)
SAI CONSTRUCTIONS
M/S PARDEEP KOHLI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .