| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC BARAHATTA GOLAI BANSBOTAY DARJEELING 734201 | DARJEELING | DARJEELING | WEST BENGAL | 734201 | ₹23.7 L | L1 | Accepted-AOC Quoted Lowest Rate. |
| 2 | L2₹24.0 LRejected-Finance LODHOMA BAZAR LODHOMA DIST DARJEELING 734201 | LODHOMA | DARJEELING | WEST BENGAL | 734201 | ₹24.0 L | L2 | Rejected-Finance Did not quote Lowest Rate. |
| 3 | L3₹24.2 LRejected-Finance FATINGTAR LODHOMA DARJEELING 734201 | DARJEELING | DARJEELING | WEST BENGAL | 734201 | ₹24.2 L | L3 | Rejected-Finance Did not quote Lowest Rate. |
Tender Value
₹21.6 L
EMD Value
₹43,261
Closing Date
24 Feb 2026, 11:00 amClosed
Project Manager, RHP, St-II
Administrative Building, Dovan, Lodhoma, Darjeeling, 734201
Repair, maintenance and minor civil works for the road in between Link Road and 10th km Milestone towards Dhotrey under RHP St-II.
2026_WBSED_998290_2
PM/RMM/e-Tender/CIVIL/25-26/23 Dated.03.02.2026
Open Tender
CIVIL WORKS
690 days
Rammam Hydel Project, St-II
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹43,261
2 Jun 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
Cleaning of “V” type drain along the road and removal of silt, slip and uprooting weeds, if any, up to height of 1 mtr on hill side
Cleaning of box type drain along the road and removal of silt, slip and uprooting weeds, if any, up to height of 1 mtr on hill side.
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. (Extra quantity of earth for filling shall be obtained from road side borrow pits.) v/p 277,l-10.01 of PWD SOR(Roads)
Cutting of branches of trees shrubs and trimming of grass and weed ii) Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914 for Rural Roads of MORD . v/p - 281, i- 10.16 of PWD SOR(Roads)
Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side. v/p - 242, i- 3.28 of PWD SOR(Roads)
Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works . .v/p - 232, i- 2.01(b) of PWD SOR(Roads)
Supply Mazdoor (The minimum Labour wages as per Office order of the Labour Commssioner, W.B)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150m as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . V. In Hard rock ( blasting prohibited ) (iii) Without pumping out water V/p-284,I-12.01 (V)of PWD SOR(Roads)
Labour for laying 150 mm to 200 mm boulder soling including rough dressing, hand packing and ramming down small pieces in the interstics excluding rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. (Analysed)
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor - Pakur variety - 1:3:6 proportion. (III) Cement concrete with 32 mm down graded gravel excluding shuttering V/P-18, Sl. 45 PWD S.O.R (bldg.) 3rd corrigenda
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (b) River bazreeV/P-26, I-10(ii), 3rd Corrigenda, PWD SOR (Building)
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (b) River bazreeV/P-26, I-10(ii), 3rd Corrigenda, PWD SOR (Building)
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. ii) (1:3:6) proportion V/P-13, I-34 PWD S.O.R(bldg.), 3rdcorrigenda
Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) V/p 326, I - 18.30 S.O.R (Rds)
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. v/p-326 SOR (Rds)
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site (a) In Road and Jhora Work V/p-22, I-44 of PWD SOR(BLDG)
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. V/P-332, I-18.05 PWD S.O.R (Roads)
Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates /river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. (0.72 m3 of grit and 0.48 m3 of coarse sand) V/p 305, I- 13.05 P.W.D SOR(Rds)(Analysed)
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment,wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications. V/p-304, I-13.03 of PWD SOR(Roads)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORDI) By Manual Means a) In area of non-thorny jungle V/P No. 233, I-2.04 of PWD SOR(ROAD)
II) Maintenance of Culverts Slab type Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clause 1908 for Rural Roads of MORDV/P-281, I-10.13 PWD S.O.R (Roads)
Non sehedule item (Rate should be analysed from present market rates of different element in the item against documentary evidence with 5% overhead charge10% contrators profit & 1% BOCW Cess towards BOCWWA ACT 1996.IN that case contractual rate will not be applicable
All items covering PWD, SOR, West Bengal ( Bldg w.e.f 01.11.2017 (15th corrigenda 07.09.2022) and Roads & Briges w.e.f 30.08.2018 (10th corrigenda 24.08.2022)
Add BOCW cess @1% on the rate of all above items
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_2444609.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid