Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹32,040
Closing Date
28 Dec 2020, 4:00 pmClosed
Executive Engineer PWD
Executive Engineer PWD
Construction of Apporach Wall Left/Right Sides Steel Foot Bridge Kasba to Kirni Guntrian .
2020_PWDJK_111017_5
e-NIT No. 89/2020-21 dated 08-12-2020
Open Tender
Civil Works
Item Rate
45 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PWD Poonch
₹32,040
Yes
4 Jan 2021
9 Dec 2020
29 Dec 2020
9 Dec 2020
28 Dec 2020
9 Dec 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m,including getting out excavate earth and disposal of surplus excavated earth as dirested: All kinds of soil .
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas ( exceeding 30cm in depth, 1.5 m in width as well as 10 sqm on plan ) including disposal of excavated earth, lead up to 50m and lift upto 1.5 m, as directed by Engineer-in-Charge. Classification of soil : Complete Job
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with : 1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ). including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with : 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) . including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with : 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns , piers ,abutments,pillars, posts, struts, butteresses , string or lacing courses , parapets ,coping ,bed blocks, anchor blocks , plain window sills ,fillets etc upto floor five level , including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with : 1:2:4 with ( 1 cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size) . including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
Random rubble masonary with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12(1 cement:6 coarse sand:12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 ( 1 cement:6 coarse sand).including curing , all leads /lifts & carriages (Complete job)
Dry random rubble masonary (Nallah) with hard stone in foundation and plinth. Without bond stone. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Dumping stone including cost of stones. On Horizontal on level. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring,shuttering,finishing and reinforcement. -All work up to plinth level. 1:2:4 ( 1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size) . including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Centring and shuttering including strutting propping etc. and removal of form for :-
Foundations,footings, bases of columns etc for mass concrete
Walls (any thickness) including attached pilasters,buttreses,plinth and string courses etc.
Columns, pillars, piers, abutments, posts and struts.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Hand-packing stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 202 mm crates including supply of stones , cost of zinc coated gabions crates. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
PARMEET SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .