Replacement by installation, testing and commissioning of 6 cusecs discharge 56 mtr. Head H.C. Pump coupled with suitable rating three phase induction Motor with all allied works at L.I.S Ambaran.
2023_IFC_203462_1
MID/AN/180
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
90 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
11 Feb 2023
25 Jan 2023
4 Feb 2023
25 Jan 2023
3 Feb 2023
28 Jan 2023
27 Jan 2023
Dismantling of the 6 cusec discharge 56 mtr head HC pump at lift irrigation station LIS Ambaran by way of demounting the pumping machinery from the bed plate after removing the pump, motor ,electric connections, coupling pulleys, suction and delivery pipes. The Job includes shifting of new pumping unit to Lift irrigation station Ambaran by mechanical transport . Unloading of pumping unit at the site of Lift irrigation station by using crane and manual labour . The job involves modification of the base frame as per site conditions. Fitting and installation of 6 cusec discharge x 56mtr head pump with motor, coupling pulley and base frame on the foundation with the help of nuts, bolts and washers.modification made to suction and delivery lines if required as per site condition. Fastening of the MS suction pipe and delivery pipe to the suction and delivery side of pump by using nut, bolts, washers and rubber packing . Checking the alignment with the help of tools and tackles Making of electrical connections to the motor. Priming the newly installed pumpset and testing of the pumping unit on load ,Complete Job includes cost of material , consumable, handling loading, unloading , transportation charge ,labour charges for both skilled/semiskilled labour and hiring charges for crane , tripod stand , tools and tackles required during the execution of the job at site. Recommended make of pump:- Kirloskar make as per IS standards. Type of Pump :- Mixed flow, split casing HC pump Pump size :- preferably 200x200 mm (suction and Delivery) Type of water-: cold water, silt laden,raw water(fresh raw water) . Recommended make of Motor:- Three phase induction motor 200 HP compatible with Pump of kirloskar make or any other as per IS standards. Material of construction :- 1. Impeller- Cast iron 2. Pump Shaft - Stainless steel 3. Wearing Ring - Cast iron 4. Pump casing - Cast iron 5. Base frame – Mild steel. 6. Gland- Cast iron 7. Shaft sleeves- Stainless steel
R K ELECTRICAL MECHANICAL ENGINEERING AND FABRICATION WORKS
M/S UK MECH AND ELECT ENGG WORKS
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .