| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹20.7 L+₹1.2 L (6.09%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹20.8 L+₹1.3 L (6.69%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹21.3 L+₹1.8 L (9.11%)Admitted-Fee/PreQual/Technical/Finance AT KENTAL PS KISHORENAGAR DIST CUTTACK | PURI | ODISHA | 752120 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹22.3 L+₹2.8 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹35.5 L
EMD Value
₹35,500
Closing Date
22 Sept 2026, 1:00 pmClosed
S.E, Kendrapara Irrigation Division, Kendrapara
O/o the S.E, Kendrapara Irrigation Division, Kendrapara-754211
Improvement to Disty.no.11 of Pattamundai Canal
2026_KIRRD_140710_4
e-Procurement Notice No.KID-03 of 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Kendrapara
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹35,500
Yes
25 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the brick or stone masonry in lime or cement mortar above 3.00M height including stacking the useful materials for reuse and removing the debris away from the work site etc. complete as per direction of the Engineer-in-charge. | 8.82 | One Cum. | 877.2 | ₹7,736.9 |
| 2 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. | 357.82 | One Cum. | 210.5 | ₹75,321.11 |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. | 81.72 | One Cum. | 926.9 | ₹75,746.27 |
| 4 | Cement concrete (M-15) with 40mm & down graded size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture,Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 81.58 | One Cum. | 6,026.6 | ₹4,91,650.03 |
| 5 | CC (M-15) with 20mm & down graded size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 284.55 | One Cum. | 6,382.2 | ₹18,16,055.01 |
| 6 | R.C.C (M-25) with 20mm & down graded size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 25.42 | One Cum. | 7,224.9 | ₹1,83,656.96 |
| 7 | Rigid smooth centering & shuttering for CC/RCC works including false work and dismantling them after casting including cost, carriage & royalty and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. (a) Base of Column, Foundation, Plinth Band, footing, mass concrete etc. | 813.97 | One Sqm | 250.1 | ₹2,03,573.9 |
| 8 | Supplying, fitting & placing in position uncoated HYSD bar for M.S. reinforcement for RCC work including straightening, cutting, bending, binding and tying the rails and placing in position including cost, carriage & all other taxes of M.S. steel & binding wire 18 to 20 gauge etc. complete as per direction of the Engineer-in-charge. | 27.43 | One Qtl. | 9,045.3 | ₹2,48,112.58 |
| 9 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ) | 527.63 | One Cum. | 255 | ₹1,34,545.65 |
| 10 | Providing laying spreading & compacting stone aggregates of Grade-I metals of 90mm to 45mm size to water bound macadam specifications for compacted thickness of 100mm using 1.21 cum of metal 0.27 cum of stone screened dust & 0.08 Cum of binding materials for 10 sqm including spreading in uniform thickness, hand packing rolling with 3-wheeled steel roller 8-10 tones in stages to proper grade & camber applying & brooming crusher dust & binding materials to fill up the interstices, watering & compacting to proper density as per clause 404 of MoSRT & H specificationfor Road & Bridge works (4th revision) includingcost conveyance,royality & GST of all materials to all materials to work site etc complete as per direction of the Engineer in charge. | 28 | One Cum | 3,908.5 | ₹1,09,438 |
stage.html
html • 0.03 MB
finance_609031.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
DTCN_KID_121.pdf
Tender Documents • 1.69 MB
BOQ_609031.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .