| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 13 1 THAKUR DAS BANERJEE ROAD KOL 700056 | KOLKATA | KOLKATA | WEST BENGAL | 700056 | Accepted-Technical Documents are Ok |
| 2 | Accepted-Technical | Accepted-Technical Documents are Ok |
| 3 | Accepted-Technical | Accepted-Technical Documents are Ok |
| 4 | Accepted-Technical 675 R N GUHA ROAD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | Accepted-Technical Documents are Ok |
| 5 | Accepted-Technical | Accepted-Technical Documents are Ok |
Tender Value
₹4.8 L
EMD Value
₹9,578
Closing Date
10 Sept 2026, 12:00 pmClosed
A.E., R.G.KAR MEDICAL COLLEGE H.SUB DIVISION, PW.D
1,KHUDIRAM BOSE SARANI R.G.KAR MEDICAL COLLEGE AND HOSPITAL, KOLKATA 700 004
Day to day maintenance of Building works for 2026-27 in the different Hospital Buildings of R.G.Kar Medical College and Hospital under jurisdiction of Section-II of R.G.Kar Hospital Sub-Division under Kolkata North Health Division.Phase-I
2026_WBPWD_5019022_2
WBPWD/AE/RGKHSD/ eNIT-08/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
R.G.KAR Medical College and Hospital
AS PER NIT
5 documents required · 5 mandatory
₹9,578
Yes
12 Oct 2026
19 Aug 2026
14 Sept 2026
25 Aug 2026
10 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 402.55 | SQM | - | - | 17.6% |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 909.75 | SQM | - | - | 8.95% |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 2.28.1 All kinds of soil | 410 | SQM | - | - | 34.15% |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 4.47 | CUM | - | - | 2434.25% |
| 5 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead 15.13.1 Of area 3 sq. metres and below | 78.35 | SQM | - | - | 143.5% |
| 6Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead 15.14.1 Of sectional area 40 square centimetres and above | ||||||
| 7 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 150.88 | SQM | - | - | 54.65% |
| 8 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge. 26.28.3 25 mm average thickness | 77.08 | SQM | - | - | 126.75% |
| 9 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. 26.29.1 Bars upto 12 mm diameter | 373.5 | /M | - | - | 8.25% |
| 10 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer- In-charge complete in all respect. 26.31.1 SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 150.88 | SQM | - | - | 141.2% |
stage.html
html • 0.14 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
2911.pdf
Tender Documents • 1.58 MB
BOQ_5090698.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .