| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-AOC | ₹39.6 L | L1 | Accepted-AOC Contractor quoted lowest rate. |
| 2 | L2₹40.7 L+₹1.1 L (2.86%)Rejected-Finance | ₹40.7 L+₹1.1 L (2.86%) | L2 | Rejected-Finance Contractor quoted higher rate. |
| 3 | L3₹42.1 L+₹2.5 L (6.42%)Rejected-Finance | ₹42.1 L+₹2.5 L (6.42%) | L3 | Rejected-Finance Contractor quoted higher rate. |
| 4 | L4₹43.4 L+₹3.8 L (9.61%)Rejected-Finance | ₹43.4 L+₹3.8 L (9.61%) | L4 | Rejected-Finance Contractor quoted higher rate. |
| 5 | L5₹44.0 L+₹4.5 L (11.3%)Rejected-Finance | ₹44.0 L+₹4.5 L (11.3%) | L5 | Rejected-Finance Contractor quoted higher rate. |
| Sl No | Description | Qty | Unit | M/S KESANG CONSTRUCTION L5 | M/S DHAGPA ENTERPRISES L8 | M/S P R CONSTRUCTION L7 | M/S L G BUILDERS L2 | M/S ACE BUILDERS L3 | M/S T K BUILDERS L1 | M/S L N BUILDERS L4 | M/S RHEGON CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating over areas,n exc 1.5 m deep and getting out complete all as specified and directed. | 6.5 | Cum | 621.3 ₹4,038.44 | 645.03 ₹4,192.72 | 627.47 ₹4,078.52 | 574.26 ₹3,732.69 | 580 ₹3,770.02 | 563 ₹3,659.5 Lowest | 597.4 ₹3,883.12 | 618.19 ₹4,018.25 |
| 2.00 | M&L cement concrete (1:4:8) type D2 (using 40mm graded stone aggregate) as in foundation filling and mass concrete complete all as specified and directed. | 5.5 | Cum | 9,499.45 ₹52,246.97 | 10,065.66 ₹55,361.1 | 10,126.41 ₹55,695.28 | 8,910 ₹49,005 Lowest | 8,999.1 ₹49,495.05 | 9,000 ₹49,500 | 9,359.06 ₹51,474.85 | 9,736.94 ₹53,553.15 |
| 3.00 | Surface excavation not exc 30 cm deep and averaging 15 cm deep and getting out in hard /dense soil | 39.35 | Sqm | 112.39 ₹4,422.54 | 113.46 ₹4,464.56 | 110.15 ₹4,334.53 Lowest | 115.83 ₹4,557.91 | 114.67 ₹4,512.33 | 117 ₹4,603.95 | 113.52 ₹4,467.21 | 111.27 ₹4,378.31 |
| 4.00 | Rough excavation not exceeding 1.5 m deep and getting out in hard/dense oil. | 44.77 | Cum | 415.07 ₹18,582.49 | 406.6 ₹18,203.56 | 398.63 ₹17,846.62 Lowest | 441 ₹19,743.57 | 432.18 ₹19,348.7 | 450 ₹20,146.5 | 423.54 ₹18,961.72 | 406.76 ₹18,210.84 |
| 5.00 | Excavation in trenches n,exc 1.5 m wide and n.exc 1.5 m deep for foundation and getting out in hard/dense soil. | 77.55 | Cum | 1,073.11 ₹83,219.33 | 1,253.97 ₹97,245.44 | 1,205.74 ₹93,505.23 | 901 ₹69,872.55 | 955.06 ₹74,064.9 | 850 ₹65,917.5 Lowest | 1,012.36 ₹78,508.8 | 1,137.49 ₹88,212.48 |
| 6.00 | Returning/filling in including spreading, levelling, watering and well ramming in layers n exc 25 cm in hard/dense soil. | 63.15 | Cum | 204.73 ₹12,928.4 | 234.72 ₹14,822.36 | 221.43 ₹13,983.36 | 182 ₹11,493.3 | 189.28 ₹11,953.03 | 175 ₹11,051.25 Lowest | 196.85 ₹12,431.15 | 212.91 ₹13,445.54 |
| 7.00 | Removing excavated material n.exc 50m and depositing where directed at a level n exc 1.5m above the starting point. | 62.26 | Cum | 434.06 ₹27,024.28 | 456.11 ₹28,397.22 | 451.59 ₹28,116.06 | 409.02 ₹25,465.59 | 417.2 ₹25,974.9 | 401 ₹24,966.26 Lowest | 425.54 ₹26,494.39 | 442.74 ₹27,564.77 |
| 8.00 | M & L for RCC (1:2:4) Type B-1 (using 20mm graded aggr) Slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves. | 0.43 | Cum | 9,781.68 ₹4,206.12 | 10,676.77 ₹4,591.01 | 9,978.29 ₹4,290.66 | 9,494 ₹4,082.42 | 9,588.94 ₹4,123.24 | 9,400 ₹4,042 Lowest | 9,684.83 ₹4,164.48 | 9,879.49 ₹4,248.18 |
| 9.00 | M&L for RCC (Design mix) M-25 (20mm graded aggregate) in foundations,footings,foundation beams ;plinth beams ;bases for column and mass concrete complete all as specified and as directed. | 5.55 | Cum | 8,498.81 ₹47,168.4 | 7,876.58 ₹43,715.04 Lowest | 7,996.53 ₹44,380.75 | 9,312 ₹51,681.6 | 9,032.64 ₹50,131.15 | 9,600 ₹53,280 | 8,761.66 ₹48,627.22 | 8,243.85 ₹45,753.35 |
| 10.00 | M&L for hard core of gauge n.exc 63mm (broken stone and boulders), deposited, spread and levelled in layers nexc 15 cm thick, watered and rammed to a true surface. | 9.59 | Cum | 2,398.16 ₹22,998.33 | 2,418.35 ₹23,191.97 | 2,303.19 ₹22,087.59 Lowest | 2,548 ₹24,435.32 | 2,497.04 ₹23,946.61 | 2,600 ₹24,934 | 2,447.1 ₹23,467.68 | 2,350.19 ₹22,538.36 |
Tender Value
₹40.1 L
EMD Value
₹81,000
Closing Date
22 Oct 2025, 6:00 pmClosed
Rohit Gogoi
GE859EWS
PROVN OF 02 X BATHROOM AND 04 X TOILETS SIZE 07 METER X 4.10 METER INCLUDING EACH PROTECTIVE WORK ALONGWITH CONNECTION TO EXISTING SEPTIC TANK OF 852 AT COY PROVN OF LABOUR RESTING ROOM AT 384 COY ASC SUP TYPE B PROVN OF 04 X FLOOD LIGHT WITH 01 LIGH
2025_MES_725196_2
8936/E8
Open Tender
Civil Works
Works
180 days
Tawang
As per tender document
7 documents required · 7 mandatory
₹500
GE 859 EWS
₹81,000
Yes
22 Nov 2025
8 Oct 2025
23 Oct 2025
8 Oct 2025
22 Oct 2025
15 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tender.pdf
Tender Documents • 1.57 MB
BOQ_822110.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .