Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33,000
Closing Date
18 Aug 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Mechanical irrigation division Anantnag HQ Awantipora
Replacement of thimbles to 200 HP capacity 02 No starters at LIS Wurranhall for new installed 25 cusec pump 200 HP motor and old pump 25 cusec 125 hp motor thimbles of aluminium cables extension of leads to 120 P motor by way of brazing process and r
2021_IFC_133683_5
17/MIDA of 2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Semthan
Replacement of thimbles to 200 HP capacity 02 No starters at LIS Wurranhall for new installed 25 cusec pump 200 HP motor and old pump 25 cusec 125 hp motor thimbles of aluminium cables extension of leads to 120 P motor by way of brazing process and r
2 documents required · 2 mandatory
₹50
Yes
Ex Engineer MID Ang HQ Awantipora
Yes
20 Aug 2021
9 Aug 2021
20 Aug 2021
9 Aug 2021
18 Aug 2021
9 Aug 2021
180 days
Amount
Proper Connections to be given to the 02 no starters of 200 HP capacity at Lift Irrigation Scheme Wuranhal . The cable got damaged and need replacement, the starters needs to be connected with new installed 25 Cu pump and 200 HP motor & old pump of 25 Cu capacity & 125 HP motor. The job includes fitting of starters by using the departmental cable which is lying at site. The job also includes laying of departmental HT cable available at site by removing the aluminium conductor from Station to Ht Transformer. Aprox. 21 no copper thimbles of 300 mm size & 9 no Aluminium thimbles of requites size will be required to make proper connections and make scheme operational. The job has to be carried out at the site by using skilled labours, tools and tackles.
Repairs to the 150 KVA stabilizer at L.I.S Semthan by way of following process :- Replacing the regulator assembly of 15 inch size. The regulator assembly should be make in India or equivalent make. The same should be done by using tools , tackles and highly qualified skilled technicians adept to tackle such type of jobs. The bus bars shall be insulated with specific type of insulation tape also denoting the color of phases in Red, yellow & blue ( RYB ). Re-assembling the units and testing of Voltage stabilizer on full load at site.
Complete thimbling aluminium cable, extension of leads to 120 HP motor by way of brazing process at Lift Irrigation Scheme Semthan by way of the following processes:- a). Extending the wire coming out from motor by way of brazing using oxygen & Acetylene gas as the wire of motor is squeezed due to heating of thimbles which are attached to aluminum cable. The damage is caused because of continuous running of equipments as metal Aluminum is having thermal expansion more than copper. As repairs to the connection plate is included. b). Providing and fitting of three required size bus bars to avoid any spark. c). Repairs to the damaged end points, putting copper thimbles of required size on both side. The thimbles need to be attached to wire by using crimping tool ensuring the termination should not be kept loosed. After repairs pumping unit need to be testing on full load at site. The entire job is to be carried out with skilled laborers and coolies using special tools and tackles required for the job.
M/S NEW STAR ELECTROMECH
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .