| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.5 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹41.8 L+₹4.3 L (11.5%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹39.4 L
EMD Value
₹40,000
Closing Date
12 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Providing Infrastructure Development in Schools and Creating Public utilites 7 Works of Chithamur Block in Chengalpattu District Having Package No 26
2022_RDTN_238003_1
RC No 4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works - Buildings
Item Rate
90 days
Chithamur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹40,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
5 Jul 2022
90 days
Amount
PART I: Construction of Girls toilet in PUP School in Illedu at Chunambedu Village Panchayat Estimate Amount : Rs.5.17 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART II: Construction of Girls toilet in PUP School in Manapakkam at Chunambedu Village Panchayat Estimate Amount : Rs.5.17 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART III: Construction of PDS Building in Manapakkam Village at Chunambedu Village Panchayat Estimate Amount : Rs.8.67 Lakhs
Earthwork excavation in all classes of soils except hadr rock in hard ordinary soil with initial lead and lift including all other labour chargesetc. Complete as per SS 20 B.
Filling with good dry Msand including cost and conveyance to site and labour charges for filling, watering, tamping etc. complete
Cement Concrete 1:4:8 ( One Cement Four sand and eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and Erecting centering for sides and soffiots including necessary supports & Labour charges etc., completely.
Supplying and Erecting centering for sides and soffiots including necessary supports & Labour charges etc., completely.
Reinforcement Cement Concrete 1:11/2:3 (One cement, one and half part of sand, three Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly for all RCC including cost conveyance and all labour charges etc. complete.
Brickwork in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site mixing, palcing, curing and all labour charges etc. complete
Brickwork in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site mixing, palcing, curing and all labour charges etc. complete
Supply and fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc. complete.
Granolithic Flooring CC1:2:4 (one of cement two of sand and four hard brokken stone) 25mm thick using 20mm ISSmetals including all other charges etc.,
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly compl
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta
Special Ceiling Plastering in CM 1:3 mix, 10mm thickness including cost and conveyance of all materials to site and labour charges etc. complete.
Plastering in CM 1:5 mix, 12mm thickness including cost and conveyance of all materials to work site from approved quarry sources and labour charges etc. complete.
Fabrication and Supply of MS Door of any size with Double Leaves outer frame made of 35 x 35 x 5 mm equal MS 'L' angle for Horizontal and Vertical members and the shutter frame strengthened by stiffeners of 2 Nos Horiz. And 3 nos. of Diagonal using MS Fla ( 1.00 x 2.10m)
Fabrication and Supply of MS Door of any size with Double Leaves outer frame made of 35 x 35 x 5 mm equal MS 'L' angle for Horizontal and Vertical members and the shutter frame strengthened by stiffeners of 2 Nos Horiz. And 3 nos. of Diagonal using MS Fla ( 1.00 x 2.10m)
Fabrication and Supply of MS Door of any size with Single Leaves outer frame made of 35 x 35 x 5 mm equal MS 'L' angle for Horizontal and Vertical members and the shutter frame strengthened by stiffeners of 2 Nos Horiz. And 3 nos. of Diagonal using MS Flat of size 20 x 5 mm fully covered with 18 gauge plain MS Full Sheet welded with shutter frame neatly including painting the whole unit with one coat of best quality of red oxide prime including cost, conveyance, loading, unloading etc., of size
Fabrication and Supply of MS window of any required size with three Leaves outer frame made of 35 x 35 x 5 mm equal MS 'L' angle mullion section made of 35 x 35 x 5 mm equal 'T' Section Shutter frame made of 25 x 25 x 5 mm equal MS 'L' angle for Horizontal
Fabrication and Supply of MS N type Glazed Ventilator of any required size with three Leaves outer frame made of 35 x 35 x 5 mm equal MS 'L' angle mullion section made of 35 x 35 x 5 mm equal 'T' Section Shutter frame made of 25 x 25 x 5 mm equal MS 'L' angle for Horizonta
Supply and fixing of RCC Jolly including the cost of materials and labour charges, conveyance to the site and fixing charges etc., complete as per standard specification
Supply and fixing of MS Rolling Shutter including the cost of materials and labour charges, conveyance to the site and fixing charges etc., complete as per standard specification
Supply and fixing of steel Counter of size 0.60 x 1.30 m including cost and conveyance of all materials to site etc. complete
Fixing in Position Mild Steel Door including Joineries and all other labour charges etc., complete as per standard specification
Fixing in Position Mild Steel Window & Ventilator including Joineries and all other labour charges etc., complete as per standard specification
White washing One coats with approved colour and quality including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
Painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with plastic emulsion paint of approved colour and quality including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
Painting two coats over new iron works using ready mixed enamel pain including the cost of paint and labour charges etc., complete complying with the standard specification and as directed by the Departmental Officers
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART IV: Construction of Girls toilet in PUP School in Andarkuppakm at Vanniyanallur Village Panchayat Estimate Amount : Rs.5.17 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART V: Construction of Girls toilet in PUP School in Pondhur at Pondhur Village Panchayat Estimate Amount : Rs.5.17 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART VI: Construction of Boys toilet in PUP School in Nerkunam at Nerkunam Village Panchayat Estimate Amount : Rs.4.90 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
PART VII: Construction of Girls toilet in PUP School in Naankalathur at Chitharkadu Village Panchayat Estimate Amount : Rs.5.17 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Brick work in CM 1:5 mix using coutry bricks including all materials to site etc complete
Reinforce Cement concrete 1 :1.5 : 3 mix using 20mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Erecting centering shuttering including necessary supporte for plain surface in foundation and basement and all in floor for RCC column footing including all chargers etc complete
Supply and Fabrication of steel including cost and convenyance all materials to site etc complete
Paving the floor finishing the top of roof with one course of machine pressed tilles of size 23x23x2 cm 1:3 mix 12mm thick including all chargers etc complete
Dadooing walls with Glazed tilles of any colour ans any size 1:2 10mm thick including all materials to site etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Plastering in CM 1:5 mix using 12mm thick including all materials to site etc complete
Plastering in CM 1:3 mix using 10mm thick including all materials to site etc complete
Providing Granothic pattern in cc 1:2:4 mix using 10-12mm chips including all chargers etc complete
Towards the cost of steel door of size 0.75x1.80m including all labour chargers etc
Painting with Exterior Emlusion paint two coat including all materials to site etc complete
Painting with new iron works ready mixed paint two coat including all materials to site etc complete
Provision for 1000 litters capacity HDPE tank
Provision of wash basin with all accessories
Provision for water closet
Provision for EWC
Drilling of 150mm dia borewell hard rock rear to any required DTH including labour chargers etc complet
Supply and delivery 150mm dia pvc casing pipe inclduing all chargers etc complete
Cost and supply of 1HP Submersible pumpset motor 50x50m including all materials tosite etc complete
Cost and supply of 1HP single phase Panel board with two level guard including all chargers etc
Supply and delivery of 32mm dia Block Hose pipe inclduing all chargers etc complete
Cost and supply of 3 core 2.50sqmm flat type copper cable including all chargers etc complete
Erection charers to new submersible pumpset motor and fixing of Panel board including all chargers etc complete
Supply and fixing of 50mm dia Non Return Valve
Supply and fixing of 50mm dia GI Gate valve
Supply and fixing of 500 litters capacity with HDPE tank inclduing all chargers
Supply and fixing of Europian water closet
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.ANBU
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .