| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC 00 SHIVPURI BRIJRAJ NAGAR MARTHNA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.4 Cr+₹32.8 L (10.7%)Rejected-AOC | ₹3.4 Cr+₹32.8 L (10.7%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.4 Cr+₹36.9 L (12.0%)Rejected-AOC 121004 | ₹3.4 Cr+₹36.9 L (12.0%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.5 Cr+₹43.8 L (14.3%)Rejected-AOC | ₹3.5 Cr+₹43.8 L (14.3%) | L4 | Rejected-AOC L4 |
| 5 | L5₹3.5 Cr+₹44.2 L (14.4%)Rejected-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹3.5 Cr+₹44.2 L (14.4%) | L5 | Rejected-AOC L5 |
Tender Value
₹3.8 Cr
EMD Value
₹7.7 L
Closing Date
8 Jan 2024, 11:00 amClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC MAHOBA
CONSTRUCTION OF BOULDER PITCHING AND BED BLOCKS IN KABRAI FEEDER.(LOT-2)
2023_UPIDC_875925_2
11/SE/2023-24
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹7,223
₹7.7 L
1 Feb 2024
1 Jan 2024
8 Jan 2024
1 Jan 2024
8 Jan 2024
1 Jan 2024
Amount
Earth work in Parwa soil in digging or in embankment i/c lead up to 30 m and lift up to 1.50 m i/c dressing making profile and manual compaction but excluding mechanical compaction.
Excavation of foundation in Mar, Rankar and Kankar mixed soils i/c lift up to 1.50 m and lead upto 30.00 m i/c filling, watering, ramming, of excavated earth into the trenches or up to the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directedby Engineer-in-charge upto a distance of 30m from the foundation trenches.
Providing and laying M-15 cement concrete (1:2:4) including mixing, placing, mechanical vibration, curing with cost of all materials, labour and T&P etc. complete as per direction of engineer in charge.
Providing & laying R.C.C. 1:1.5:3 / CUM.(M-20)/Cum including mixing, placing, mechanical vibration, curing with cost of all materials, labour and T&P etc. complete as per direction of engineer in charge.
CR stone masonry in 1:4 cement mortar i/c all cost of labour material T&P etc complete .
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Stone boulder pitching pitching with 25-60 kg stone i/c all cost of labour material T&P etc complete
P/L CC block ( 0.8x0.8x0.6m) in position i/c cost of all labour material T&P etc required for proper completion of job
M/S LODHI ENTERPRISES
M/S KUMAR MANGLAM CONSTRUCTION
M/S KASON CONSTRUCTION
M/S CHAUDHARY ENTERPRISES
CHANDRA SEN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .