| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder to awarded the work. | |
| 2 | L2₹10.3 L+₹33,288.50 (3.33%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER |
Tender Value
₹8.0 L
EMD Value
₹16,000
Closing Date
29 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Division HPPWD Kotkhai
Providing and Laying Kharanja stone soling and G-I in K.M 2/00 to 3/00 and B/Wall in wire crate at R.D. 2/360 to 2/385
2022_PWD_58497_5
PW-KD-E-Tender/2021-22-6701-03 dt 10-03-2022
Open Tender
Civil Works - Roads
Item Rate
60 days
HPPWD Kotkhai Division
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
₹16,000
19 Dec 2022
24 Mar 2022
30 Mar 2022
24 Mar 2022
29 Mar 2022
24 Mar 2022
90 days
Amount
Preparation of sub grade by dressing to camber(earth work for the cutting involved for sub grade to be paid for separately depending upon the classification of soil completed as per HP.PWD. Specifications. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Consolidation of sub grade with road roller including making good the undulation etc.with earth or quarry soil etc. and rerolling the sub-grade completed as per HP.PWD. Specifications. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Providing & laying stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD. specification.1990 volume-I andand direction of the Engineer-in-Charge. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Excavation for structures:- Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying of boulder apron laid in wire crates with 4mm dia G.I. wire conforming to IS:280 and IS: 4826 in 100mmx100mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing and technical specifications Clause 1301 including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
M/s Pardeep Sublaik
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .