Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹95,220
Closing Date
5 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE NEW DELHI
GE NEW DELHI, SP MARG NAR ABHM GATE NO 5
SPL REPAIR TO SEWAGE LINE AT VARIOUS LOCATIONS IN ABHM AND ABHM ANNEXE UNDER GE NEW DELHI
2026_MES_794533_1
NIT No GE/ND-68/2026-27
Open Tender
Civil Works
Item Rate
270 days
GE NEW DELHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE New Delhi
₹95,220
Yes
17 Oct 2026
17 Oct 2026
7 Nov 2026
17 Oct 2026
5 Nov 2026
29 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PHASE I (CARRYOUT SURVERY) :-
Carrying out comprehensive engineering topographical, alignment, and sub-surface utility surveys using high-precision Electronic Total Station (ETS) and Dual-Frequency DGPS instruments to map the existing, damaged, and proposed sewage network (300mm dia Main Line and 150mm dia Sub Lines) in strict all as per specifications and direction. The scope of work encompasses establishing permanent concrete Bench Marks tied to standard as per norms, taking spot levels at maximum 10-meter intervals, recording top and invert levels of existing manholes, and utilizing electronic pipe/cable locators or non-destructive Ground Penetrating Radar (GPR) alongside manual trial pits to trace and map all intersecting underground water lines, HT/LT electrical cables, telecom/OFC routes, and storm drains and must ensure horizontal accuracy within ±3mm and vertical leveling loop closure error as per IS code, culminating in the submission of three hard-bound copies and soft files (AutoCAD .dwg and PDF) containing detailed site plans, longitudinal sections (scales 1:500 H and 1:50 V) displaying gradients, chainages, and a comprehensive Utility Conflict Matrix, with possible recommadation for repair of existing sewage line or laying of new sewage line duly marked on drawing, which must be vetted by any govt approved collage complete all as specified and directed. | 1 | Each Job | - | - |
| 2 | PHASE II : During execution or repair of the sewerage line, necessary temporary arrangements for diversion, pumping and continuous disposal of running sewage complete with all required safety appliances, barricading and precautionery measures shall be made by the contractor at his own expense as per site conditions and as directed by Engr in charge and no extra payment shall be admissible on this account.
Excavation in trenches not exc 1.5 mtr wide & not exc 1.5 mtr in depth for foundation etc and getting out in any type of soil complete all as specified and directed. | 75 | Cum | - | - |
| 3 | Excavation in trenches not exc 1.5 mtr wide & not exc 1.5 mtr in depth for foundation etc and getting out in Soft/disintegrated rock complete all as specified and directed. | 600 | Cum | - | - |
| 4 | Excavation in trenches not exc 1.5 mtr wide & exc 1.5 but not exc 3.0 mtr in depth for foundation etc and getting out in Soft/disintegrated rock complete all as specified and directed. | 225 | Cum | - | - |
| 5 | Excavation in trenches not exc 1.5 mtr wide & exc 3.0 but not exc 4.5mtr in depth for foundation etc and getting out in hard rock complete all as specified and directed. | 5 | Cum | - | - |
| 6 | Excavation over areas not exc 1.5 mtr in depth and getting out in any type of soil complete all as specified and directed. | 15 | Cum | - | - |
| 7 | Excavation over areas exc 1.5 mtr and not exc 3 mtr in depth and getting out in soft/ disintegrated rock complete all as specified and directed. | 10 | Cum | - | - |
| 8 | Excavation over areas exc 3 mtr and not exc 4.5 mtr in depth and getting out in hard rock complete all as specified and directed. | 2 | Cum | - | - |
| 9 | Returning filling tn, incl spreading, levelling, watering and well ramming in layer not exc 25 cm in each layer complete all as specified and directed. | 279.5 | Cum | - | - |
| 10 | Removing surplus excavated soil to a distance not exc 50 Mtr & depositing where directed at a level not exc 1.5 Mtr above the starting point complete all as specified and directed. | 652.5 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender68.pdf
Tender Documents • 0.93 MB
BOQ_891096.xls
BOQ • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .