Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.5 L+₹1.2 L (15.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.6 L+₹1.3 L (15.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹10.0 L+₹1.7 L (19.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.9 L
EMD Value
₹25,857
Closing Date
23 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Forest Officer Social Forestry Kupwara
OFFICE OF THE ASSISTANT CONSERVATOR OF FORESTS SOIL AND WATER CONSERVATION DEPARTMENT DISTRICT KUPWARA HQ HANDWARA
Providing and Laying Crate wire protection bunds 56 Nos, Errection of DRSM Check dams 100 Cum, Bag embankment 4000 and Up-gradation of pond 01 No
2026_SWCD_324534_4
e-NIT No-03 of 2026-27 dated 12/09/2026
Open Tender
Civil Works
Item Rate
30 days
Budnambal
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Pooling Account No.0110010200001106
₹25,857
Yes
i/o Joint Director Soil and Water Cons Deptt Sgr
29 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
14 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of Soil Conservation works (as detailed below) by way of 56 No. of crate wire structures at Budnambal. | |||||
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1m from cutting edge 56x16'x5'x1.30' = 5824 Cft or 164.9 Cum | 164.9 | Cum | 576.45 | ₹95,056.61 |
| 1.02 | Hand-packing stones in wire-crates; excluding cost of crates and stones 56x16'x4'x4' =14336 Cft Deduct 15% voids = 2150.40Cft Total: = 12185.60 Cft or 345.1 Cum | 345.1 | Cum | 361.65 | ₹1,24,805.42 |
| 1.03 | Carriage of stones average lead of 250 m by head load (to be paid as per actual) quantity vide item No 2 | 345.1 | Cum | 441.68 | ₹1,52,423.77 |
| 1.04 | Supply of crate wire mesh (4”x4”) 4mm, including carriage up to site of work 56x 16'x16' = 14336 Sft Lids 112 x4'x4' = 1792 Sft Total = 16128 Sft or 1498.33 Sqm | 1,498.33 | Sqm | 280 | ₹4,19,532.4 |
| 2Errection of DRSM Checkdams (100 Cum) at Budnambal | |||||
| 2.01 | Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site ) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts , excluding cost of stones & bond stones ,its carriage up to site of work, labour component ,supervision etc, complete job.
(At Spots):-1x( 1.50m + 1.20m)/2 x 1.20m x 72.62m = 117.65 cum
D/d 15% voids = (-) 17.65 cum
T= 100 cum | 100 | Cum | 1,099 | ₹1,09,900 |
| 3Providing and laying of Bag embankment (4000 Bags) | |||||
| 3.01 | Supply of empty bags of superior quality well knitted without any damage including sewing the same after filling complete job
4000 no | 4,000 | No | 3 | ₹12,000 |
| 3.02 | 2 Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Jute bags:
1’-6”x4”x2’-6”= 1.23 cft or 0.035 cum x 4000 =140 cum | 140 | Cum | 272 | ₹38,080 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1094852.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .