| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All documents |
| 2 | Accepted-Technical | Accepted-Technical All documents |
| 3 | Accepted-Technical | Accepted-Technical All documents |
Tender Value
₹2.2 L
EMD Value
₹4,480
Closing Date
14 Sept 2026, 4:00 pmClosed
Ex. Engineer CDC SMC Srinagar
Regal Lane Lal Chowk Srinagar
Construction of drain at Lakhripora Nowshera from Muzaffar Najar to Usmania Masjid
2026_HAUDD_323534_2
e_NIT_NO_30_CDC_of_2026_27
Open Tender
Civil Works
Percentage
15 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
FA/ CAO SMC,
₹4,480
15 Sept 2026
5 Sept 2026
15 Sept 2026
6 Sept 2026
14 Sept 2026
6 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and Sacrifying of road surface including stacking of serviceable material within 50Mtr lead Bituminous Macadam Road | 60 | Sqm | 305.95 | ₹18,357 |
| 2 | Earth work in excavation by manual means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil | 38.84 | Cum | 479.3 | ₹18,616.01 |
| 3 | Providing and laying of stone soling in trenches for drain including manholes. | 6.27 | Cum | 1,000 | ₹6,270 |
| 4 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:4:8 (1cement:4coarse sand: 8graded stone aggregate 40mm nominal size) Crushed | 3.34 | Cum | 5,202.9 | ₹17,377.69 |
| 5 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 40mm nominal size) Crushed | 3.11 | Cum | 5,733.6 | ₹17,831.5 |
| 6 | Centring & shuttering including strutting propping etc. & removal of form work for:-a)-vertical wall | 7.2 | Sqm | 286.35 | ₹2,061.72 |
| 7.01 | Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work:- 40mm N.S. Stone Agg | 3 | Cum | 388.72 | ₹1,167.71 |
| 7.02 | 20mm N.S. stone agg. | 3.89 | Cum | 357.58 | ₹1,390.99 |
| 7.03 | Sand from Ganderbal avg. lead of 12 Kms. | 3.45 | Cum | 454.1 | ₹1,564.83 |
| 8 | Refilling of excavated earth back in trenches plinth, etc. layer not exceeding 20cm in depth, consolidating each layer by ramming and watering complete job. | 18.6 | Cum | 218.4 | ₹4,062.24 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_1089379.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .