Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAdmitted-Finance | ₹31.7 L | L1 | Admitted-Finance |
| 2 | L2₹33.9 LAdmitted-Finance | ₹33.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical 150 276 K K RAM DAS ROAD NIMTA KOLKATA 700049 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700049 | - | - | Rejected-Technical Disqualified. |
| Sl No | Description | Qty | Unit | M/S ANJALY CONSTRUCTION L2 | A. C. CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or tacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete; Depth of excavation not exceeding 1,500 mm. | 430 | Cum | 12.13 ₹5,215.9 | 11.31 ₹4,863.3 Lowest |
| 2.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work); With earth obtained from excavation of foundation. | 400 | Cum | 49.09 ₹19,636 Lowest | 73.66 ₹29,464 |
| 3.00 | Cutting and clearing jungles including shrubs, waterweeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 1,600 | Sqm | 2.04 ₹3,264 | 1.9 ₹3,040 Lowest |
| 4.00 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete. | 660 | Sqm | 7.14 ₹4,712.4 | 6.65 ₹4,389 Lowest |
| 5.00 | Supplying to site empty cement polythene bags (capacity 50 kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg). | 60,000 | Each | 6.12 ₹3,67,200 | 5.7 ₹3,42,000 Lowest |
| 6.00 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB: - Volume of earth /sand filled bags should not be less than 0.028 cum/ bag. | 60,000 | Each | 16.64 ₹9,98,400 | 15.5 ₹9,30,000 Lowest |
| 7.00 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 60,000 | Each | 3.06 ₹1,83,600 | 2.85 ₹1,71,000 Lowest |
| 8.00 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. | 60,000 | Each | 6.12 ₹3,67,200 | 5.7 ₹3,42,000 Lowest |
| 9.00 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor [Pakur Variety] (1:3:6). | 7.5 | Cum | 4,926.6 ₹36,949.5 | 4,588.5 ₹34,413.75 Lowest |
| 10.00 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, as per relevant IS codes. Pakur Variety. | 45 | Cum | 4,886.43 ₹2,19,889.35 | 4,551 ₹2,04,795 Lowest |
Tender Value
Refer Docs
EMD Value
₹67,700
Closing Date
16 Mar 2026, 4:00 pmClosed
GM(P and P), DPL.
Office of the GM (P and P), 2nd Floor, Technical Building, Unit 7, DPL, Durgapur, Paschim Bardhaman, West Bengal , Pin-713201.
Repairing of embankments of Forebay of Raw Water Intake Pump House 3 of Water Works.
2026_DPL_1014396_1
WBDPL-13./1/2026-GM-POW (DPL)-DPL/WW/E-369 Dated - 25.02.2026
Open Tender
CIVIL WORKS
Item Rate
365 days
Raw Water Intake Plant, DPL Water Works.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹67,700
Conference Hall, 4th Floor, Technical Building.
17 Jul 2026
25 Feb 2026
20 Mar 2026
25 Feb 2026
16 Mar 2026
25 Feb 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or tacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete; Depth of excavation not exceeding 1,500 mm. | 430 | Cum | - | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work); With earth obtained from excavation of foundation. | 400 | Cum | - | - |
| 3 | Cutting and clearing jungles including shrubs, waterweeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 1,600 | Sqm | - | - |
| 4 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete. | 660 | Sqm | - | - |
| 5 | Supplying to site empty cement polythene bags (capacity 50 kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg). | 60,000 | Each | - | - |
| 6 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB: - Volume of earth /sand filled bags should not be less than 0.028 cum/ bag. | 60,000 | Each | - | - |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 60,000 | Each | - | - |
| 8 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. | 60,000 | Each | - | - |
| 9 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor [Pakur Variety] (1:3:6). | 7.5 | Cum | - | - |
| 10 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, as per relevant IS codes. Pakur Variety. | 45 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_2491703.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].