| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance | ₹2.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.8 Cr+₹33.2 L (13.6%)Accepted-Finance | ₹2.8 Cr+₹33.2 L (13.6%) | L2 | Accepted-Finance L2 |
| 3 | L3₹2.9 Cr+₹46.3 L (19.0%)Accepted-Finance | ₹2.9 Cr+₹46.3 L (19.0%) | L3 | Accepted-Finance L3 |
| 4 | L4₹3.2 Cr+₹77.4 L (31.7%)Accepted-Finance | ₹3.2 Cr+₹77.4 L (31.7%) | L4 | Accepted-Finance L4 |
Tender Value
₹2.6 Cr
Closing Date
5 Jul 2021, 12:00 pmClosed
Chief Engineer (Geology)(GW)
Senior Executive Director (GW), WAPCOS Limited 1st Floor, ALPS Building, 56 Janpath, Connaught Place, New Delhi-110001
Construction of Cement Concrete Check Dam in Jaisalmer District Rajasthan under Package-III including maintenance of completed structures for 01 year
2021_WAPCO_79068_1
WAP/GWRDM/ARS/2021-22/04
Open Tender
Construction Works
Works
120 days
Delhi
As Per Tender
4 documents required · 4 mandatory
₹0
Exempted
Delhi
11 Jan 2022
8 Jun 2021
6 Jul 2021
8 Jun 2021
5 Jul 2021
22 Jun 2021
21 Jun 2021
Amount
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Dag belling
Excavation including loading, unloading, disposal and dressing of excavated earth with all lead and lift including dressing of excavated area and dewatering wherever required complete in all respect ( Hard soil mixed with Kankar / boulders, Morrum, Rocky Area)
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 50m and all lifts.
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.
Earth work in rough (borrow area) excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Lead up to 250 M
Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km
Compaction of earth or highly weathered strata by mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
Dry boulder/stone filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface
Stone laying in required profile properly hand packed using stone of specified size including all lead & lifts 30 cm thickness (± 5 % thickness) Stone Pitching 300 mm thickness
Providing an fixing MS board as per drawing MS board including primer, painting and lettering as per direction of Engineer-in-charge as per drawing
Description of Work / Item(s)
Amount
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Dag belling
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Hard soil mixed with Kankar / boulders, Morrum/Rocky Area)
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 50m and all lifts.
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.
Earth work in rough (borrow area) excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Lead up to 250 M
Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km
Compaction of earth or highly weathered strata by mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor required as per site condition to obtain dry density of (i) at least 95% of Standard Proctor's density
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface
Stone laying in required profile properly hand packed using stone of specified size including all lead & lifts 30 cm thickness (± 5 % thickness) Stone Pitching 300 mm thickness
Providing an fixing MS board as per drawing MS board including primer, painting and lettering as per direction of Engineer-in-charge as per drawing
Description of Work / Item(s)
Amount
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Dag belling
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Hard soil mixed with Kankar / boulders, Morrum/ Rocky Area)
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 50m and all lifts.
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.
Earth work in rough (borrow area) excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Lead up to 250 M
Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km
Compaction of earth or highly weathered strata by mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface
Stone laying in required profile properly hand packed using stone of specified size including all lead & lifts 30 cm thickness (± 5 % thickness) Stone Pitching 300 mm thickness
Providing an fixing MS board as per drawing MS board including primer, painting and lettering as per direction of Engineer-in-charge as per drawing
Description of Work / Item(s)
Amount
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Dag belling
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect ( Hard soil mixed with Kankar / boulders, Morrum/Rocky Area)
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 50m and all lifts.
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.
Earth work in rough (borrow area) excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Lead up to 250 M
Add extra for each subsequent lead of 500m or part there of beyond ½ Km and up to 5 km
Compaction of earth or highly weathered strata by mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density
Watering of earth including cost of carriage of water when source of water is up to 1 Km
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface
Stone laying in required profile properly hand packed using stone of specified size including all lead & lifts 30 cm thickness (± 5 % thickness) Stone Pitching 300 mm thickness
Providing an fixing MS board as per drawing MS board including primer, painting and lettering as per direction of Engineer-in-charge as per drawing
M/s Tan Singh Chouhan
Jai Baba Construction Company
M/s Prabhu Dan Detha And Company
M/s Tan Singh Chouhan
Jai Baba Construction Company
M/s Prabhu Dan Detha And Company
M/s Tan Singh Chouhan
Jai Baba Construction Company
M/s Prabhu Dan Detha And Company
M/s Tan Singh Chouhan
Jai Baba Construction Company
M/s Prabhu Dan Detha And Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .