Gram Saraiya No. 2 Milan Chauraha se hokar Vishwakarma Basti Sharda Sahayak Nahar Gram Chhahi tak marg ka nav nirman ka karya
2026_CEUVZ_1184372_2
4141/183 Com-Vns Circle/2026-27 Dated 25-08-2026
Open Tender
Civil Works
Percentage
180 days
Varanasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.0 L
Yes
SE, Vns Circle, PWD, Varanasi
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Roadway Cutting / Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5.(Including all Taxes & Laboure cess but Excluding GST) | 3,000 | Cum | 56 | ₹1,68,000 |
| 2 | Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1. (Including all Taxes & Laboure cess but Excluding GST) | 900 | Cum | 61 | ₹54,900 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD specificaions 401(Including all Taxes & Laboure cess but Excluding GST) | 250 | Cum | 2,560 | ₹6,40,000 |
| 4 | Providing, laying, spreading and compacting of sukrut stone aggregates of specific sizes to water bound macadam specification (G-3) including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, MORD specifications 405.3(Including all Taxes & Laboure cess but Excluding GST) | 360 | Cum | 3,210 | ₹11,55,600 |
| 5 | Construction of plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, (Including all Taxes & Laboure cess but Excluding GST) | 700 | Cum | 8,190 | ₹57,33,000 |
| 6 | RCC Hume Pipes NP-3 inculidng collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints (350 mm)(Including all Taxes & Laboure cess but Excluding GST) | 22.5 | mtr | 1,600 | ₹36,000 |
| 7 | Maintainance cost :- Maintainance cost will be paid year wise as per prevailing Government order No. 17/2024/SA-113/23-1-2024-23-1099/113/2023 date 16.01.2024.Maintainance cost will adjusted as per final cost of constrction and will be paid accordingly | 1 | Job | - | - |
| 7.1 | 1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | 1 | Job | - | - |
| 7.2 | 2nd year - maintainance cost 0.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | - | Job | - | - |
| 7.3 | 3rd year - maintainance cost 0.50% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST. | - | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
T-2.pdf
Tender Documents • 0.47 MB
BOQ_2228029.xls
BOQ • 0.29 MB
4519.pdf
PDF • 0.26 MB
4375-Shivpur.pdf
PDF • 0.44 MB
Ashivpur.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .