Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC J K NAGAR P O BIDHANBAG P S RANIGANJ BURDWAN 713337 | RANIGANJ | BURDWAN | WEST BENGAL | 713337 | ₹5.8 L | L1 | Accepted-AOC Awarded as per approved TCR |
| 2 | Rejected-Technical NORTH BLOCK COLLIERY PO BIDHANBAG BARDHAMAN 713337 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713337 | - | - | Rejected-Technical As per Approved TCR |
| 3 | Rejected-Technical VILL AND PO CHELODE PS RANIJANG BURDWAN PIN 713339 | RANIGANJ | BURDWAN | WEST BENGAL | 713339 | - | - | Rejected-Technical As per Approved TCR |
Tender Value
₹7.6 L
EMD Value
₹9,600
Closing Date
16 Mar 2026, 5:00 pmClosed
Area Engineer Civil Satgram-Sripur Area
Office of the Area Engineer Civil, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Providing Approach PCC Road for 100MT roadweigh bridge at J.K. Nager Project under J. K. Nagar (R) Mines, Satgram-Sripur Area.
2026_ECL_356362_1
ECL/SSA/GM/AE(C)/e-T/25-26/70 date 11.03.2026
Open Tender
Civil Works - Others
Percentage
30 days
J. K. Nagar (R) Mines
As per NIT
3 documents required · 3 mandatory
₹9,600
Yes
8 May 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 56.48 | cum | 188.75 | ₹10,660.6 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 38.57 | cum | 1,061.6 | ₹40,946.97 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.19 | cum | 6,007.2 | ₹79,216.95 |
| 1.04 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 28.7 | cum | 5,434.55 | ₹1,55,971.58 |
| 1.05 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 40 | sqm | 294.85 | ₹11,794 |
| 1.06 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 30 | cum | 121.05 | ₹3,631.5 |
| 1.07 | Cement concrete 1:2:4 (1 cment: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation, finishing and tamping complete. | 51.18 | cum | 6,020.1 | ₹3,08,078.62 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 14.55 | sqm | 269.3 | ₹3,918.32 |
| 1.09 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.76 | cum | 7,929.3 | ₹13,955.57 |
| 1.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 176 | kg | 95.75 | ₹16,852 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.84 MB
BOQ_369203.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .