Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.7 LRejected-AOC | ₹7.7 L | L2 | Rejected-AOC Reject |
| 3 | L3₹7.8 LRejected-AOC | ₹7.8 L | L3 | Rejected-AOC Reject |
| 4 | L3₹7.8 LRejected-AOC NA | ₹7.8 L | L3 | Rejected-AOC Reject |
| 5 | L3₹7.8 LRejected-AOC TAMIL NADU TAMIL NADU | TIRUNELVELI | TAMIL NADU | 627001 | ₹7.8 L | L3 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
22 Jan 2026, 3:00 pmClosed
Zonal Officer II
New Zonal office building, Kamarajar Salai, Chennai - 600068
PROPOSED CONSTRUCTION OF COMPOUND WALL FOR NIGHT SHELTER AT MMDA 86TH STREET (SOUTH SIDE) IN DIVISION-19, UNIT-5, ZONE-2.
2026_CoC_641160_1
Z.O.II.C.No.E1/678738/2025
Open Tender
Civil Works
90 days
Manali
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,500
8 Apr 2026
9 Jan 2026
23 Jan 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
Providing UNDER REAMED PILES RCC25cm (10") dia of 358cm length and350cm depth from G.L.cast in situ withsingle reamed bulbin cement concrete1:1.5:3 including boring, ecting,vibrating, curing, hire charges for drillingequipments, etc,
Earth work excavation for foundation in allkinds soils in varying depths ludingdismantling any masonry or roots metwithin foundation and shoring with planks,baling water if necessary and filling thesides with excavated earth includingclearing and levelling site etc.,
Supplying clean Crushed Stone Sand(Commercially called M-Sand) Sand sandand filling in regular layers of 15cm thickeach including watering, consolidating etc.complete for foundation, basement, etc.
Plain Cement concrete work 1:4:8 (1cement, 4 Crushed Stone Sand (Commercially called M-Sand) and 8 bluegranite broken stone jelly 40mm gauge)including consolidation curing, etc.complete for foundation, etc. uptobasement
Supplying, fabricating and placing inposition Ribbed tor steel (RTS) for all RCCworks as per design given including cost ofsteel and GI binding wire (18 G) in all floorsetc., complete complying with standardspecification (contractor has to make his own arrangements for the supply of steeland binding wire
Supplying and erecting shuttering includingnecessary supports for plane surface infoundation and basement for RCC column footings,pintol blocks, plinth beam,staircase steps, critical steps, criticalpiers,etc
Supplying and erecting centering for sidesand soffits including supports and structtingupto 3m high for plane surfaces suchasRCC coloumns,top and bottom slabs ofboxing. sill labs,sun shades,etc
Providing and laying in position, standardised concrete Mix M-20 Grade usingIn-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including
Brick work in following Cement Mortar using best quality Burnt Clay Brick of size9” x 4 3/8” x 2 3/4” with class designation of 10 conforming to IS 1077-1992for foundation and basement including Cost of Mortar Plasticizer curing,
Plastering the surface of walls with Cement Mortar 1:4 (One cement and Fourplastering sand), 12mm thick in all floors includin mortar plasticizer at 200ml per 50Kg of cement used, curing etc.
White washing one coat over a new plastered surface
Painting the new plastered walls with two coats
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
678738.pdf
Tender Documents • 1.51 MB
BOQ_767882.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid