Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance NO 2 16 ANDIPALAYAM ELLAPUDUR MYLAMBADI ERODE 638314 | ERODE | TAMIL NADU | 638314 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹6,100.83 (3.03%)Admitted-Fee/PreQual/Technical/Finance NO 9 6 POOSARI CHENNIMALAI STREET CHENNIS NEST OPPOSITE TO SBI ERODE DISTRICT 636 009 | SALEM | TAMIL NADU | 636009 | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹2,100
Closing Date
23 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer PWD Building C and M Division Erode
Special repairs to Leaky roof in VAO Office at Vempathi B in Anthiyur Taluk in Erode District
2026_PWD_723770_5
NIT.14 2026 27 BCM DIVISION ERODE Dated.06.11.2026
Open Tender
Maintenance Works
Percentage
60 days
Anthiyur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2,100
25 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
23 Nov 2026
7 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away and carefully stacking materials of Plain Cement Concrete etc., complete as per standard specification and as directed by the deparmental officers. | 1.43 | M2 | 520.23 | ₹743.93 |
| 2 | Dismantling, Clearing away and carefully stacking the materials useful for reuse of RCC by manual / by using deploying machineries etc, complete complying with standard specifications and as directed by the deparmental officers. | 0.33 | M3 | 4,610.31 | ₹1,521.4 |
| 3 | Dismantling clearing away and carefully stacking the materials useful for reuse of Doors & windows including removal of frames, hinges and fastenings etc., complete as per standard specification and as directed by the deparmental officers. | 2.78 | M2 | 164.31 | ₹456.78 |
| 4 | Clean removal of cement plaster from walls etc.,complete complying with standard specification and as directed by the departmental officers. | 68.24 | M2 | 9.06 | ₹618.25 |
| 5 | Clean removal of cement plaster from walls and racking out joints 20mm deep for ceiling etc., complete complying with standard specification and as directed by the departmental officers. | 30.15 | M2 | 12.01 | ₹362.1 |
| 6 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 1.55 | M3 | 235.3 | ₹364.72 |
| 7 | Cement Concrete 1:5:10 (One Cement, Five Crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification-Mixing by manual means | 0.35 | M3 | 5,334.1 | ₹1,866.94 |
| 8 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.35 | M3 | 455.6 | ₹1,526.26 |
| 9Brick work in Cement Mortar 1:5 (one cement and five crushed stone sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 9.01 | For Foundation and Basement | 1.55 | M3 | 7,283.05 | ₹11,288.73 |
stage.html
html • 0.02 MB
finance_869005.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tencon_vaoofficevempathib.pdf
Tender Documents • 2.16 MB
BOQ_869005.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .