Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC | ₹35.4 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹37.9 L+₹2.5 L (7.19%)Rejected-AOC | ₹37.9 L+₹2.5 L (7.19%) | L2 | Rejected-AOC NOT AWARDED |
| 3 | L3₹39.9 L+₹4.6 L (12.9%)Rejected-AOC | ₹39.9 L+₹4.6 L (12.9%) | L3 | Rejected-AOC NOT AWARDED |
| 4 | L4₹40.1 L+₹4.7 L (13.4%)Rejected-AOC | ₹40.1 L+₹4.7 L (13.4%) | L4 | Rejected-AOC NOT AWARDED |
| 5 | L5₹41.4 L+₹6.0 L (17.0%)Rejected-AOC | ₹41.4 L+₹6.0 L (17.0%) | L5 | Rejected-AOC NOT AWARDED |
Tender Value
₹59.9 L
EMD Value
₹1.2 L
Closing Date
1 Jun 2026, 6:00 pmClosed
S K PANIGRAHI, EE, R AND B, PPA
S K PANIGRAHI, EE, R AND B, PPA
Annual Maintenance and Repair of Residential GJAI qtrs at Madhuban for the year 2026-27
2026_MoS_907934_1
CE/RandB/Accts-30/25/124
Open Tender
Civil Works
Works
365 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹1,000
Yes
As per Tender Document and e-TCN
₹1.2 L
Yes
3 Sept 2026
8 May 2026
3 Jun 2026
8 May 2026
1 Jun 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantlimg & removing of the following old damaged items as per the reqiurment at site at any height upto any floors including scaffolding, disposing the same at specified place including supplying of all labours, materials, T&P etc all complete as per the direction of Engineer-in-charge.(Excluding GST). | |||||
| 1.01 | Plastering | 500 | Each Sqm. | 49.82 | ₹24,910 |
| 1.02 | A.S. flooring | 200 | Each Sqm. | 99.64 | ₹19,928 |
| 1.03 | Brick work. | 30 | Each Cum. | 1,391.61 | ₹41,748.3 |
| 1.04 | Old damaged grading from roof surface. | 600 | Each Sqm. | 117.7 | ₹70,620 |
| 1.05 | R.C.C. member. | 13 | Each Cum. | 1,509.3 | ₹19,620.9 |
| 2Brick work in Fly Ash Bricks of size 25Cm X 12Cm X 8Cm and having crushing strength not less than 75 Kg/Cm² to 99Kg/Cm with C.M (1:6) including splay / cutting, racking out the joints curing, hoisting, staging at any height with cost and supply of all materials, labour, T&P, tollage, royalties, taxes, staging, scaffolding, curing, water charges all transportation charges etc. all complete & as per direction of Engineer-in-charge. (Excludicng cost of GST). | |||||
| 2.1 | In foundation & plinth
For man hole / Inspection chamber /drains | 10 | Each Cum. | 4,664.56 | ₹46,645.6 |
| 2.2 | In super structure
for damage RCC balcony ,parapet , kitchen pedestal | 20 | Each Cum. | 5,046.69 | ₹1,00,933.8 |
| 3 | 12mm thick Cement Plastering with CM(1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding thecorners wherever found necesary including cost & supply of all materials, labour, T&P, staging scaffolding, watering, curing, taxes, tollage, royalties, etc. complete as directed by Engineer-in-charge.(Excluding GST). | 500 | Each Sqm. | 174.17 | ₹87,085 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_954271.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .